![EAGO DZ972-1F8 Installation Instruction Download Page 6](http://html1.mh-extra.com/html/eago/dz972-1f8/dz972-1f8_installation-instruction_3315098006.webp)
Junction box
1. Put shower tray in place and adjust legs on tray until tray is level in
both directions
-Method: Put spirit level on the flat surface on edge of shower tray to
check if the shower tray is horizontal or not. If it is not horizontal, please
adjust the height of adjustable leg. After adjusting the level position
check that all of the adjustable legs are touching the floor and that the
locking nuts on each leg are fastened.
2. After tray is leveled check for any rock in the tray and re-level tray
if necessary. Refer to Picture A.
3. Connect the drain on the bottom of shower tray and connect small
10mm silicone hose to the drain and to the underside of the fitting in the
tray. On the top side of fitting on the tray is where the hose from the
drain solenoid from the steam generator will attach. Ensure that metal
fitting in tray is tight so as to eliminate potential leaking.
Tray drain fitting
Summary of Contents for DZ972-1F8
Page 1: ......
Page 3: ......
Page 21: ...Model Number Purchase Location Purchase Date Purchase Date Model Number...