/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
BATTERY TEST LOG
OPERATOR SERVICES DATES
BATTERY TEST DATES
PRE INSTALLATION INSTRUCTIONS
CAUTION
!
!
BEFORE PROCEEDING WITH INSTALLATION
READ THIS MANUAL THOROUGHLY AND
CAREFULLY FOLLOW ALL THE OPERATION
INSTRUCTIONS.
WARNING - HIGH VOLTAGE
ONLY A QUALIFIED TECHNICIAN SHOULD SERVICE THIS GATE OPERATOR
IMPORTANT:
THE PHONE SYSTEM TRANSFORMER SHOULD BE INSTALLED DIRECTLY
TO THE OPERATOR OUTLETS AND NOT TO THE EAGLE POWER
I
UNIT.
The Eagle-Power
II
Battery Back up is designed to provide back up power to a gate operator when the
main AC supply voltage is interrupted or disconnected. There are two operations to the Eagle-Power
II
.
First, (and recommended) when experiencing a power failure the back-up system not only supplies
continuous power to run the gate operator, but will supply all of the the AC accessories (i.e. Loop
Detectors, MAG lock, Photo Eyes and Edge Sensors) with all the power required to keep their full
functions uninterrupted. Secondly, in the occurrence of power failure the gate can be opened by the
Power
I "
hold open" relay and left open until power is restored. However, with the availability of
continuous power available to the operator, this would not be necessary unless desired.
Using the Power
II
battery back up system with its 115V
continuous power, enables the gate operator
and all of its safety features to continue to be UL 325 / 991 compliant.
IMPORTANT:
MONTHLY TESTS MUST BE PERFORMED ON BATTERY.
(1)