background image

Summary of Contents for GHT91-GRN-AZ

Page 1: ...EAGLEPEAKTunnelGreenhouse13Ftx6 6Ftx6 6Ft INSTRUCTION MANUAL Thank you for choosing Eagle Peak...

Page 2: ...e limited to 6 months from the date of original purchase This warranty does not cover any product purchased through non authorized dealers and or online auction websites This warranty shall be void as...

Page 3: ...missing or if you have any questions contact us through the website Place all parts out of the box in an open area and position them on the floor in front of you Remove all wrappers and put them back...

Page 4: ...al frame as shown in the below diagram No Part QTY No Part QTY 1 10 1 5 2 3 4 5 6 7 8 9 PE 2 2 2 10 5 5 5 A 2 B C D E F G 2 1 4 4 27 25 PE Top 2 1 1 1 1 1 1 1 1 1 1 2 3 3 4 4 4 4 5 5 5 5 5 6 6 6 6 6 7...

Page 5: ...u will need SET UP THE TUNNEL FRAME No Part QTY No Part QTY 2 2 3 4 6 8 9 2 2 2 7 1 1 A 1 B 4 1 8 6 2 2 7 4 6 3 3 4 9 A B fig 2 fig 2 fig 2 fig 1 fig 1 2X B 7 6 4 2 B fig 4 fig 4 fig 3 fig 3 8 9 6 4 3...

Page 6: ...5 Step 2 You will need SET UP THE TUNNEL FRAME 1 1 1 1 1 6 7 6 6 2 4 6 4 6 4 2 B B fig 5 fig 6 fig 6 fig 7 fig 7 fig 7 fig 5 fig 5 fig 5 3X 2X No Part QTY No Part QTY 4 1 4 6 3 6 B 3 B...

Page 7: ...6 Step 3 You will need No Part QTY No Part QTY 2 1 2 3 5 1 1 5 B 5 SET UP THE TUNNEL FRAME B fig 9 fig 10 fig 10 fig 9 fig 9 B fig 8 fig 8 fig 8 3 B 4 4 5 5 1 1 1 1 1 4 5 5 4 5 5 2 3 2X 2X...

Page 8: ...u will need No Part QTY No Part QTY 2 1 2 3 6 7 1 1 1 5 5 B SET UP THE TUNNEL FRAME B fig 11 fig 11 fig 12 fig 12 2 3 2 B 1 1 1 1 1 5 5 5 5 5 5 5 6 6 6 6 6 6 6 B 7 7 6 5 3 B fig 13 fig 13 fig 13 fig 1...

Page 9: ...THE TUNNEL FRAME You will need B 2X 6 fig 16 fig 17 fig 17 fig 19 fig 19 fig 16 fig 16 A fig 15 fig 15 8 9 B B 3 7 1 1 1 1 1 2 6 B fig 18 fig 18 2 1 3 1 6 6 6 8 9 No Part QTY No Part QTY 2 1 2 3 8 A...

Page 10: ...9 Step 6 You will need SET UP THE TUNNEL FRAME Put the nut caps on nuts for screw protection purpose No Part QTY 27 C C 27X Cover Each Nut...

Page 11: ...10 Step 7 You will need ATTACH THE PE TOP No Part QTY 1 PE Attach the PE top and secure the top to the frame using built in ties PE Top 4X 4X PE...

Page 12: ...11 Step 8 ROLL UP THE DOOR AND CURTAINS Roll up the door and curtains if needed...

Page 13: ...12 Step 9 SECURE THE TUNNEL FRAME D Attach the ropes on the top and insert stakes in the ground for better stability E You will need No Part QTY No Part QTY 4 D 4 E...

Page 14: ...13 Step 10 SECURE THE TUNNEL FRAME Put weights on the overlong cover to help weigh it down...

Page 15: ......

Page 16: ......

Reviews: