Fig. 7
Fig. 9
Fig. 8
Fig. 10
Fig. 11
Hold Down Frame
Fig. 2
Fig. 1
SET UP INSTRUCTIONS
1)
Open floor on a flat, level surface, with a door end facing the
wind.
Damage to Hinge Joint may occur if Floor is not evenly
supported.
2)
Assemble Roof Tube sections.
4)
Fig. 2, Raise second U Frame,
again keeping Frame about 24”
away from Corners of Fabric Top.
Assemble Frame and push into
Corners of Fabric Top and adjust
Seam in Fabric to follow Curve of
the Frame. Clip end of Roof Tube
Assembly to U Frame and slide
next to inside edge of nuts as
shown in Fig. 3 & 4. Clip second
Roof Tube Assembly into place
next to Nuts. With both Roof
Tubes next to inside edge of
Nuts...Install Roof Bows, Fig. 4.
3)
Fig. 1, Raise one U Shaped Frame. Keep Frame about 24” away
from Corners of Fabric Top and Slip ends of U Frame over Crimped
ends of Floor Poles...Shock Cord will pull Frame together. Push As-
sembled Frame into Corners of Fabric Top and adjust Seam in Fab-
ric so that it follows the Curve of the Frame. Snap end of a Roof
Tube Assembly to U Frame and Support Frame as shown in Fig. 2.
TAKE DOWN INSTRUCTIONS
1)
Fig. 5, Remove Roof Tubes from one U Frame and use one
Roof Tube to Support other U Frame as shown. Pull U Frame
away from Fabric Corners, then pull apart and Fold Frame to Floor
while keeping Fabric away from Frame
. Do Not Wrap Fabric
Around Frame.
NOTE: U Frame should lay inside of the Floor
Poles, not on top of them. Repeat for other U Frame, Fig 6.
Fig. 5
Fig. 6
2)
Fold Tent as shown in Fig. 7,8,9,10 and11.
Fig. 4
Roof Bows
Fig. 3
Pull shock cord into
slot in fish door to
hold door open.