background image

W W W . T M G I N D U S T R I A L . C O M

P 0 / 14

T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9

Summary of Contents for TMG-CP2030F-1.0

Page 1: ...W W W T M G I N D U S T R I A L C O M P 0 14 T o l l F r e e 1 8 7 7 7 6 1 2 8 1 9...

Page 2: ...ation Check all components and parts before installation All parts are marked with a part number please refer to the parts list to make sure you have all parts Choose a day with low or no wind to inst...

Page 3: ...lder tube 12 1 1 3A Shoulder tube middle 2 1 1 4 Sidewall tube 14 1 1 4A Short casing 55 1 1 5C Top cross bar A 5 1 1 5D Top cross bar B 1 1 1 6 Ceiling cross bar 7 1 1 6A Foot tube front and rear 4 1...

Page 4: ...l cable mounting plate 4 1 1 13 Anchor hook M14x120mm 6 1 1 14 Steel cable 3 9m 6 1 1 15 Expansion bolt 16x150mm 14 1 1 16 Waterproof silicon sealant 5 1 1 16A Teroson statu 1 1 1 17 Hex bolt M10x70mm...

Page 5: ...d for positioning all dimension lines are drawn from the center of the pipe to the center and the diagonal X must be equal to Y Installation of foundation pipes all foundation pipes shall be connected...

Page 6: ...rear truss in this step refer to figure 2 1x2 Peak arch tube 1 2x2 Middle rafter tube 2 2x2 Shoulder tube 3 2x2 Sidewall tube 4 2x2 Steel cable mounting plate 12 34x2 Hex bolt 17 1x2 Ceiling cross bar...

Page 7: ...2 Reinforced tube mounting plate 6E 6 Short casing 4A Figure 3 Parts used to install 5 middle trusses in this step refer to figure 4 1x4 Peak arch tube 1 2x4 Middle rafter tube 2 2x4 Shoulder tube 3 2...

Page 8: ...the assembly is all completed and before moving to next step refer to figure 5 Figure 5 Step 3 Assemble all trusses to the foundation pipe and connect them with 17 bolts The front and rear trusses ar...

Page 9: ...r e e 1 8 7 7 7 6 1 2 8 1 9 Figure 6 Install top cross bar A 5C and top cross bar B 5D Use 21 and 17 Hexagonal bolt fixation refer to figure 7 Parts used in this step 5 Top cross bar A 5C 1 Top cross...

Page 10: ...eel tiles must be aligned with the midpoint of the top arch tube you can mark the center of the top arch tube with a line The extension size of both ends is 50mm The size of the middle cross overlap p...

Page 11: ...7 7 7 6 1 2 8 1 9 Figure 8 Install the first color steel tile Take the first colored steel tile at the top as the benchmark ensure that both ends of each colored steel tile are aligned and lock it on...

Page 12: ...ing strips Start to install the color steel tile edge protector 9A from one side and align one end with the color steel tile edge The opening of the edge banding strip of the color steel tile shall be...

Page 13: ...e 11 Install the edge buckle 10 and the two raised card points of the edge buckle are aligned with the square holes at the interfaces of the two color steel tile edge bands and then press the buckle i...

Page 14: ...and waterproof plug Select a suitable position to fix the expansion bolt of the draw hook on the ground hook one end of the wire rope onto the wire rope mounting plate and eyebolt and fix the other e...

Page 15: ...cally to make sure all components are still firmly secured and the whole shelter is well supported Check all bolts and nuts as well as all connection points to make sure they are all in good position...

Reviews: