Installation, Operation and Parts Manual
EE-6435BWF
22
3. Connect the electrical system.
ONLY qualified electricians are permitted to do the electrical connection.
Refer to electrical connection schemes in Annex 3 before making connection.
Attention: For three phase power supply, if the lift doesn't raise and the motor may turn in the wrong direction, in such event, interchange
wires U, V in the control cabinet.
Step 10: Fill with hydraulic oil
ONLY CLEAN AND FRESH OIL ONLY .Lift must be fully lowered before changing or adding hydraulic oil.
Totally, it needs 12 liters of anti-abrasion hydraulic oil.
Firstly, fill about 10 liters oil into the oil tank. The level of oil shall reach the tippets volume mark of the tank. After the “wheel free lift “ has
been synchronized, lower the platform of the “main lift “and “wheel free lift” to the lowest position and refill the oil tank until it is full
which needs another 2 liters of hydraulic oil.
It is recommended to use HM NO.46 hydraulic oil. Use HM NO.32 hydraulic oil when average temperature of the location is below 10
degree Celsius.
Change the oil 6 months after initial use and change once per year thereafter.
Step 11: Trial commission
1. Check the electrical connection with electrical schemes to ensure that all wires are correctly connected.
Inspect steel cables at four corners of the two crossbeams to ensure that all cables are correctly in pulley slots and are not twisted with
each other. (See Annex 1 for steel cable connection scheme)
2. Turn on the main power switch and push slightly the button for raising to check if the motor runs in the correct direction. (In case the
motor runs in wrong direction, interchange wires U, V in the control cabinet.) Check oil hoses to ensure all connectors are tight against
leakage.
3. Push the button for raising until steel ropes are stretched tightly. Check the steel ropes again to ensure they are in the pulley slots and
are not twisted.
4. Push the button for raising until the main lifting platform is raised to a height about 800mm above floor. After that connect the hose
NO.10 to the slave cylinder of the wheel free lift.
5. Push the “DOWN I” button for lowering. The main lifting platform will stop lowering when it has a clearance about 300mm over the
foundation. Push the other button “DOWN II” for lowering which accompanies with acoustic warning until the main lifting platform is
completely lowered.
Step 12: Aligning and levelling
Attention: No vehicle on platforms for levelling operation.
Firstly, align the level at four corners of the runway when mechanical safety locks are released.
Switch on and push the UP button. Push the up button until the runway stays at a height about 800mm over the floor. Measure at the four
corners of the runway to see if the height are almost the same. Check with a tape measure. The deviation of the liquid level shall be within
5mm. In case the deviation exceeds 3mm, correspondingly adjust the nuts (NO.40) attached with cable over the top plate of the post until
the deviation is controlled within 3mm.
Summary of Contents for EE-6435BWF
Page 33: ...Installation Operation and Parts Manual EE 6435BWF 33 Annex 1 Steel cable connection...
Page 35: ...Installation Operation and Parts Manual EE 6435BWF 35...
Page 36: ...Installation Operation and Parts Manual EE 6435BWF 36...
Page 37: ...Installation Operation and Parts Manual EE 6435BWF 37...
Page 52: ...Installation Operation and Parts Manual EE 6435BWF 52...
Page 53: ...Installation Operation and Parts Manual EE 6435BWF 53...