Step
7:
Erect
and
secure
the
post.
1.
Use
suitable
means
to
raise
the
lifting
carriage
to
the
first
latching
position.
All
the
mounting
holes
in
the
base
plate
are
then
accessible.
Make
sure
the
locking
pawl
is
engaged.
2.
Check
the
position
of
the
base
plates
again.
3.
Drill
the
mounting
holes.
Remove
the
drilling
dust
from
the
hole.
4.
Use
a
spirit
level
to
check
the
vertical
alignment
of
the
lifting
posts.
If
necessary,
place
equalizing
plates
under
the
base
plates.
The
equalizing
plates
must
be
of
the
same
length
as
the
side
of
the
base
plate
resting
on
them.
Otherwise
the
load
of
the
base
plate
will
not
be
transferred
evenly
to
the
foundation.
5.
Erect
and
secure
the
other
post
similarly.
Step
8:
Connect
steel
cables.
1.
Route
and
fix
according
to
the
following
diagram
of
steel
cable
connection.
2.
Use
suitable
means
to
raise
carriages
at
both
sides
to
the
first
latching
point.
Ensure
the
both
carriages
are
locked.
3.
After
the
cable
being
fixed,
adjust
and
make
the
cables
at
both
sides
be
with
the
same
tightness.
(This
could
be
judged
by
the
sound
caused
by
mechanical
safety
locking
system
during
lifting
process.)
4.
Grease
with
NO.1
lithium
grease
(It
is
a