Installation
Points To Be Taken Into Consideration After Installation
5-
Do not use any other means than original
tap off boxes to supply energy from the busbar.
6-
Current rating of the busbar run should be
equal to the rating of the breaker. Do not exceed
busbar nominal current during operation.
7-
Make sure that any additional loads to the
system following do not exceed the nominal
current capacity of the busbar.
8-
Do not use busbar system as a supporting
structure for other systems.
9-
Do not use busbar system as a walk way.
10-
Do not light a fire or use welding equipment
near the busbar.
11-
Take care when handling the system
components. Do not drop the units.
12-
Do not cut or drill the busbar units.Please
consider below picture when installing the
busbar for vertical applications. Please do not
drill the busbar at any place where is marked
with red on the picture.
13-
Take precautions against adverse
environmental conditions such as rain and
snow. In addition, the busbar dripping cement,
etc. inside the building. Protect from water,
malfunctioning piping and all fluids that may
come from water jets. Cover if necessary. Cap
the ends to the busbar joint points that have
not been installed at the end of the work.
14-
Ensure the selected degree of protection (IP
rating) of the system is suitable for the working
environment.
8
KKG
G
1
3
4
5
2
12