KX-III
MANUAL
www.
eaeusa
.us
22
Installation
Plug-in Busplug
1-
Remove the fixing screw of "plug-in" tap off
point cover using cross-recessed screw driver.
3-
Throw the contact protection cover to the
recycling waste bin.
4-
Place the KXP Plug-in tap off box to the ho-
les on the busway with an angle.Push the tap off
box upwards as shown in figure 4-b.
2-
Open and push the cover back, the "plug-in"
tap off point cover should be opened to a position
which will not block the way for installation of
the box. Do not remove the cover plate.
Vertical Application
Warning!
* Do not try to install plug-in tap off boxes to
bolt-on busway or vice versa.
* Do not try to install 4 wire tap off boxes to 5
wire busway or vice versa.
1
2
3
4-b
4-a
4-b
4
P I
R T
IEC 60439-2
Bolt-on UNIT
Rated Insulation Voltage
............
Rated Frequency
..............................
Protection Degree
...........................
Wire
..........................................
: 1000 V
: 50/60 Hz
: IP55
(Ui)
(f)
(IP)
: 3P+N+PE (Housing)
E L E K T R İ K
внимание!
вмешиваться должен
только уполномоченный
персонал
1-
EAE tap off boxes are not equipped with any
protective device unless they are required by
customer. Any type of devices can be fixed in
tap off boxes providing specific informations
about device prior to manufacture in order to
adjust interlock mechanism.
2-
Tap off boxes operating mechanisms of all
electrical & mechanical interlocks should be
exersized to determine that they operate freely
to their full on and off positions.
3-
The total continuous load current should be
measured by proper instrument that does not
exceed the current rating on the busway name
plate or the designated design current.
4-
After performing all of the above inspections
and necessary repairs, it may be desirable to
perform an infra-red temperature test on all
electrical connections after busway system
is re-energized and reaches a stabilized
operating temperature.
Tap Off Boxes With Protective Devices Menin
2
1
3
4