background image

 

 

European Safety Systems Ltd.

   Impress House, Mansell Road, Acton, London W3 7QH

 

www.e2s.com

 

Tel: +44 (0)208 743 8880

 

Document No. D157-00-651-IS

 

Issue 2

 

06-03-2023

 

 

Sheet 8 of 14

 

 

The SIL 2 unit will also check for signal polarity. 
 
If a fault is found the SIL 2 unit will go into 

Fault mode

 
If power is disrupted the SIL 2 unit will go into 

Fault mode

, in 

fault mode the Power relay RLY1-1 will close whilst SIL 2 relay 
RLY1-2 will become open be circuit between terminals 1 & 2. 
 

 

 

Fault modes

 - The fault modes listed 12-1 & 12-2 below will 

make  the  SIL  2 unit  change  the  state  for  relays  RLY1-1  and 
RLY1-2. 
 
In fault mode the Power relay RLY1-1 will close whilst SIL 2 
relay RLY1-2 will become open circuit between terminals 1 & 
2. 

 

12-1 Sounder Failure 

 

 

Tone Failure 

 No Tone detected 

 

Sounder Controller failure 

 No tone generation pulse 

detected 

 

Tone Rate Failure 

 Regular tone cycle erratic 

 

12-2 Power Failure / SIL 2 Failure 

 

 

SIL 2 Controller failure 

 Internal function and system 

checking flags fault 

 

Rapid  Power  cycling 

  System  indicates  power 

instability 

 

Total Power Failure  

 
It is possible to reset these faults if they were transitory. 
 
Resetting Failure (by power cycling) - It is possible that the SIL 
2 unit can be reset by powering the unit off for a period greater 
than 20 seconds.  On  restarting  the unit  and  running  through 
the commissioning cycle the fault may clear. 

 

Resetting Failure (by Hard Reset) - It is possible that the SIL 2 
unit  can  be  reset  by  hard  resetting  the  unit  using  the  reset 
jumper within the unit (see section 15-4) on hard resetting. 
On restarting the unit and running through the commissioning 
cycle, the fault may clear. It is necessary to run the test function 
cycle again to see if the fault is still evident. 
 
If the hard reset process does not correct the latched fault the 
alarm horn sounder may require further investigation, please 
contact your local E2S representative.

 

 
 
 
 
 
 
 
 
 
 

Commissioning  System  -  Functional  start-up  of  System 
(Normally in reverse polarity mode) 

 
When Commissioning system the power must not be disrupted 

to the SIL 2 Unit within the unit’s initialization cycle which is 

seconds

 

Once past this period the SIL 2 system is fully operational and 
will be in monitoring the sounder and power in Standby mode. 

 

The relay RLY1-2 on the SIL 2 unit will only remain open for a 
maximum of 1 second on commissioning start-up. RLY1-2 will 
subsequently  close  contacts  1  &  2  indicating  healthy 
operation. Contact 1 & 2 will only remain open in the event of 
a fault or a loss of power. 

 

System Testing (Active Mode normal polarity) 

 
The SIL 2 system will remain monitoring the power in standby 
mode until the polarity is changed to normal mode to enable 
an active system for sounder functional testing. 

 

Important

:  -  The  polarity  must  be  held  in  active  mode  for  a 

period in excess of 

15 seconds

 to ensure a full system check 

is performed. 
 
Once  the  test  period  has  been  completed  the  unit  can  be 
switched back to standby mode by reversing the polarity. 
 
If  no  faults  have  been  found  during  the  test  the  relays  will 
remain in steady state. 
 
The SIL 2 unit will continue to monitor the power and module 
function. 
 

Important

: - The automated test cycle 

must

 be undertaken on 

at least a weekly basis to maintain the SIL 2 units reliability. 

 

System Activation (Active Mode normal polarity) 

 
The SIL 2 system will remain monitoring the power in standby 
mode until the polarity is changed to Active mode to enable an 
active system  for  sounder  to function as a  warning signaling 
device. 
 

Important

  :-  The  polarity  must  be  held  in  active  mode  for  a 

period in excess of 15 seconds to ensure a full system check 
is performed whilst in alarm mode, although it is expected that 
during  a  system  activation  this  period  will  be  significantly 
greater. 

 

Note

  :-  The  fault  indication  signal  on  TB1  can  take  up  to  50 

milliseconds to indicate system fault. 

 
 
 
 
 
 

 
 
 

Summary of Contents for GNExS1RDC024-S

Page 1: ...nt Max Current Sound Pressure Level dB A Max Nom GNExS1FDC024 S 24Vdc 20 28Vdc 185mA 221mA 115 110 GNExS1RDC024 S 24Vdc 20 28Vdc 185mA 221mA 110 105 Max Tone 4 Nom Tone 44 The table shows the input cu...

Page 2: ...C to 70 C Certificate No SIRA 13ATEX1139X IECEx SIR 13 0029X CSAE 21UKEX1558X Epsilon x Equipment Group and Category II 2G CE Marking and Notified Body No 2813 UKCA Marking and Notified Body No 0518...

Page 3: ...clean and that they have not been damaged during installation Ensure that the O ring seal is in place and undamaged When fitting the flameproof cover ensure the thread is engaged correctly Fully tigh...

Page 4: ...e branching point temperatures may exceed 70 C at entry point 80 C at branching point Therefore suitable heat resisting cables and cable glands must be used with a rated service temperature at least a...

Page 5: ...ed use Negative switching Figure 8 Stage Switching Polarity 8 3 Tone Selection The GNExS Alarm Horn Sounders have 64 different tones that can be selected independently for the first and second stage a...

Page 6: ...ms and a minimum wattage of 2W The resistor must be connected directly across the ve and ve terminals as shown in the following drawing The resistor leads should be kept as short as possible SIL2 line...

Page 7: ...SIL 2 Sounder Unit Monitors Standby mode and Active mode Health status of power supply Sounder correct function and tone pattern The SIL 2 sounder operates as part of a SIL 2 system The sounder will a...

Page 8: ...quire further investigation please contact your local E2S representative Commissioning System Functional start up of System Normally in reverse polarity mode When Commissioning system the power must n...

Page 9: ...ounder check on pattern generation and signal output checks Important Only tones use tones that are stated as SIL 2 approved for the SIL 2 application Ensure that the unit is set to one of these tones...

Page 10: ...rom the circuit Note a cable short circuit will not be detectable in this configuration For one unit only Sounder power supply terminal block Current drawn mA Active Mode 190mA Standby Mode 25mA SIL2...

Page 11: ...multiple SIL 2 alarm horn sounders are to be cabled in series the monitoring connections differ from that of a single alarm horn sounder For more information see manual D197 00 651 IS available from t...

Page 12: ...ion B pins 2 3 linked Places power supply terminal Fault resistor RLY 1 2 in circuit As used in 2 Wire Configuration Figure 16 J2 Header pin positions Fault Resistor FR 15 4 SIL 2 Hard Reset Function...

Page 13: ...nput GNExS1FDC024 S GNExS1RDC024 S Failure to Sound Integrity in respect of failure to release SIL 2 Total Failure rate 0 447 pmh hazardous failure rate revealed 0 443 pmh hazardous failure rate unrev...

Page 14: ...The values of resistors available are shown in table 6 below Code Resistor Value Default resistor coding as follows GNExS1FDC024AB1S1R AFZ Example of a custom requirement resistor coding GNExS1FDC024...

Page 15: ...0 1 0 0 1 0 1 1 0 0 1 0 0 0 1 0 1 0 1 0 1 0 1 0 0 1 1 0 1 0 1 1 1 0 1 0 1 1 0 1 1 0 0 0 1 1 1 0 0 1 1 1 1 0 0 0 0 0 0 1 0 1 0 0 0 1 1 1 0 0 0 1 0 0 1 0 0 1 1 0 1 0 0 1 0 1 1 0 0 1 1 1 1 0 0 1 0 0 0 1...

Page 16: ...OUT Common ve IN Common ve OUT Stage 2 ve Stage 1 ve IN Stage 1 ve OUT Common ve IN Common ve OUT Stage 2 ve Stage 3 ve EOL EOL S2 EOL S2 S3 Stage 1 ve IN Stage 1 ve OUT Stage 1 ve IN Stage 1 ve OUT...

Page 17: ...S NTS SWITCHES FOR STAGE OPERATION CUSTOMER SUPPLIED Stage 2 ve Common ve IN Common ve OUT Stage 1 ve OUT Stage 3 ve Stage 1 ve IN H2 H1 OF 2 2 EOL S2 S3 OPTIONAL LINE MONITORING RESISTOR CUSTOMER SUP...

Page 18: ...y No 2813 CSA Group Netherlands B V Utrechtseweg 310 6812 AR Arnhem Netherlands Quality Assurance Notification Module D SIRA 05 ATEX M342 Provisions fulfilled by the equipment II 2G Ex db IIB or IIC T...

Page 19: ...te and Place of Issue London 23 12 2020 EU Declaration of Conformity On behalf of European Safety Systems Ltd I declare that on the date the equipment accompanied by this declaration is placed on the...

Page 20: ...ipment II 2G Ex db IIB or IIC T3 T4 T5 or T6 Gb Standards applied EN 60079 0 2018 EN 60079 1 2014 A C 2018 Directive 2014 30 EU Electromagnetic Compatibility Directive EMC Standards applied EN 61000 6...

Reviews: