E2S GNExB2X05-S Series Instruction Manual Download Page 8

 

European Safety Systems Ltd.

   Impress House, Mansell Road, Acton, London W3 7QH

 

www.e2s.com

 

Tel: +44 (0)208 743 8880

 

Document No. D156-00-621-IS

 

Issue 1

 

27-10-22

 

 

Sheet 8 of 15

 

 

12) SIL 2 Instruction Safety/Manual 

 

 

Figure 11: The SIL 2 Module monitors the Beacon and interfaces to the customer plant. 

Warning

 

  To  maintain  the  integrity  of  the  SIL  2  units  the  system  must  be  installed,  commissioned  and  used  within  the 

parameters outlined in this manual. Failure to comply could result in an unintended unit operation or function. 

 

Warning

 

 The unit must be powered in either Standby or Active modes to comply with the SIL 2 approval requirement. If the  

power is disrupted the unit must be allowed to go through the commissioning cycle to reset. Failure to complete the 
commissioning  cycle  and  continued  disruption  in  the  power  supply  will  generate  a  fault  state  which  will  require  the 
beacon to be reset (see section 15-4). 

 
 

SIL 2 System Description 

 
The  SIL  2  module  monitors  the  function  of  the  device  and 
provides  feedback  to  the control  panel.  A  fault condition can 
be communicated by two methods: 
 

 

4 wire installation can be seen as per section 15-1. 
A  SIL  2  system  wiring  for  fault  detection  in  standby 
and active mode with independent fault contacts. 

 

2  wire  installation  can  be  seen  as per section  15-2. 
A SIL 2 system by the introduction to the monitoring 
circuit and linking in an end of line resistor can only 
register the fault in standby mode. 

 

13) SIL 2 System Terms and Function 

 
The SIL 2 Beacon Unit Monitors: 
 

 

Standby mode and Active mode 

 

Health status of power supply 

 

Beacons correct function and flash pattern 

 
The SIL 2 beacon operates as part of a SIL 2 system. 
The  beacon  will  after  commissioning  remain  powered  in 

Standby mode

 (reverse polarity) until the beacon is required 

to operate. When the signalling device is required to operate 
beacon the polarity is changed back to normal supply and the 
beacon  will  go  into 

Active  mode

  where  it  will  start  to 

function/flash.  When  periodically  testing  the  system  and 
beacons, operation is put into 

Active mode

The system panel or PLC will control whether the system is in 
either of the main two operational modes. 

 
Standby  Mode

 

  This  is  where  the  power  supply  polarity  is 

reversed  so  negative  (

ve)  is  fed  to  the  positive  (+)  beacon 

terminal  and  positive  (+)  is  fed  to  the  negative  (

ve) beacon 

terminal. 
 
In Standby mode the beacon will not flash but the SIL 2 unit 
is monitoring power supply and is set-up ready to go to Active 
(alarm) mode. 
 
Power  relay  RLY1-1  will  be  open  whilst  SIL  2  relay  RLY1-2 
will be closed contact between terminals 1 & 2. 
 
If power is disrupted the SIL 2 unit will go into 

Fault mode

, in 

fault  mode  the  Power  relay  RLY1-1  will  close  whilst  SIL  2 
relay  RLY1-2  will  become  an open  circuit  between  terminals 
1 & 2. 

 

Active Mode

 

 This is where the power is in normal polarity, 

positive  (+)  supplied  to  the  positive  (+)  beacon  terminal  and 
negative  (

ve)  is  supplied  to  the  negative  (

ve)  beacon 

terminal. 
 
In  Active  mode  the  beacon  will  output  the  selected  flash 
pattern. The SIL 2 module checks for the correct flash pattern 
output  and  the  functionality  of  the  flash  signal  generation 
process. 
 

Summary of Contents for GNExB2X05-S Series

Page 1: ...AND CABLE GLANDS IF TEMPERATURE EXCEEDS AS PER STANDARDS INDICATIONS BELOW FOR ATEX IECEx UKEX STANDARDS 70 C AT ENTRY OR 80 C AT BRANCHING POINT FOR NEC CEC STANDARDS 60 C AT ENTRY OR 60 C AT BRANCHI...

Page 2: ...in compliance with the National Electric Code CEC Class Zone Ratings Canada Standards CAN CSA C22 2 No 60079 0 Ed 4 02 2019 Explosive Atmospheres Part 0 Equipment General Requirements CAN CSA C22 2 N...

Page 3: ...mented joints is not permitted Figure 1 Flame Path The enclosure is non conducting and may generate an ignition capable level of electrostatic charges under certain extreme conditions The user should...

Page 4: ...Explosive dust atmospheres The installation of the units must also be in accordance with any local codes that may apply and should only be carried out by a competent electrical engineer who has the ne...

Page 5: ...C or the cable branching point temperature may exceed 60 C and therefore suitable heat resisting cables and cable glands must be used with a rated service temperature at least as stated below Table 3...

Page 6: ...P Switch Location Switch Setting S1 Mode SIL Approved 00 1Hz 60FPM Yes 01 1 33Hz 80FPM No 10 1 5Hz 90FPM No 11 Double Flash No Table 4 Switch Positions for Flash Patterns 9 End of Line Monitoring DC U...

Page 7: ...l and Repair Maintenance repair and overhaul of the equipment should only be carried out by suitably qualified personnel in accordance with the current relevant standards EN60079 19 IEC60079 19 Explos...

Page 8: ...and Function The SIL 2 Beacon Unit Monitors Standby mode and Active mode Health status of power supply Beacons correct function and flash pattern The SIL 2 beacon operates as part of a SIL 2 system Th...

Page 9: ...correct the latched fault the alarm horn sounder may require further investigation please contact your local E2S representative Commissioning System Functional start up of System Normally in reverse...

Page 10: ...hough it is highly recommended that the unit is wired as stated in section 15 1 as a 4 Wire System J1 Header Current Sense Resistor CSR Shown in factory default position A see section 15 3 places TB1...

Page 11: ...om the circuit Note a cable short circuit will not be detectable in this configuration For one unit only Beacon power supply terminal block Current drawn mA Active Mode 190mA Standby Mode 25mA SIL2 TB...

Page 12: ...hen no faults and faults occur If multiple SIL 2 alarm horn sounders are to be cabled in series the monitoring connections differ from that of a single beacon For more information see manual D197 00 6...

Page 13: ...Position B pins 2 3 linked Places power supply terminal Fault Resistor RLY 1 2 in circuit As used in 2 Wire Configuration Figure 16 J2 Header pin positions Fault Resistor FR 15 4 SIL 2 Hard Reset Func...

Page 14: ...Random Hardware Failures and Architectural constraints route 1H 2 As an unvoted item i e hardware fault tolerance of 0 at SIL 2 The product was assessed against failure modes Failure respond to an in...

Page 15: ...be specified when ordering The values of resistors available are shown in table 6 below Code Resistor Value Default resistor coding is as follows GNExB2X05DC024AS1S1R A AFZ Example of a custom require...

Page 16: ...ATERIAL SHEET SCALE TITLE A3 IF IN DOUBT ASK DO NOT SCALE ALL DIMENSIONS IN MM DRAWING NUMBER A B C D E F G 10 9 G F E 7 8 6 5 D C 1 3 4 2 A B D191 06 621 M ABALOS B ISARD R N POTTS OF NTS 1 1 23 09 2...

Page 17: ...B V Utrechtseweg 310 6812 AR Arnhem Netherlands Quality Assurance Notification Module D SIRA 05 ATEX M342 Provisions fulfilled by the equipment II 2G Ex db IIC T4 T6 Gb II 2D Ex tb IIIC T80 C T138 C D...

Page 18: ...Date and Place of Issue London 03 12 2021 EU Declaration of Conformity On behalf of European Safety Systems Ltd I declare that on the date the equipment accompanied by this declaration is placed on t...

Page 19: ...e Lane Eccleston Chester CH4 9JN UK Quality Assurance Notification Module D CSAE 22UKQAN0046 Provisions fulfilled by the equipment II 2G Ex db IIC T4 T6 Gb II 2D Ex tb IIIC T80 C T138 C Db IP6X Dust P...

Page 20: ...r Date and Place of Issue London 24 02 2022 UKCA Declaration of Conformity On behalf of European Safety Systems Ltd I declare that on the date the equipment accompanied by this declaration is placed o...