background image

ONE-TIME TOP INSTALLATION

Unpack and Open

1.

 

Place your E-Z UP

®

 

Frame

 in the center of the area to be sheltered. 

2. 

With partner on the opposite side of the 

Frame

, grasp two outer legs, lift the 

Frame

 slightly off the ground, 

and step backwards while pulling the 

Frame

 to open. 

(Fig A)

3. 

Stop when the 

Frame

 is approximately 1/2 of its fully-opened size. 

4. 

Set the 

Frame

 back on the ground.

Attach Fabric Top

5. 

Gently unfold the 

Fabric Top

, and place it over the semi- opened 

Frame

(Fig B)

6. 

Attach the 

Fabric Top

 to the E-Z UP

®

 

Frame

 by matching the Hook and Loop strips on the inside of the 

Fabric Top 

corners with the Hook and Loop strips on each 

Frame

 corner. 

(Fig C)

 

7. 

Pull the

 Fabric Top

 down over the 

Frame

 corners—pushing the Hook and Loop strips firmly together.

Secure Top to Frame

8. 

Line up the grommet holes on the sides of the 

Fabric Top

 to the 

Frame

 top attachment points. 

The top attachment points on the 

Frame

 are denoted by the RED tags. 

(Fig D)

 

9. 

Using a coin, unscrew the 

Top Attachment Nut

 from the frame bolt. 

(Fig E)

10. 

Place

 Fabric Top

 grommet on the 

Frame

 bolt.  

11. 

Screw on top attachment nut and tighten until snug. 

Top Fabric

 should rotate easily. Do not over-tighten. 

12. 

Repeat this procedure at each of the top attachment points.

Note: Hold the bolt assembly with one hand while tightening the top attachment nut with your other hand.

(Fig A)

(Fig C)

(Fig E)

(Fig D)

(Fig B)

(Remove Tag before Attaching Top)

Shelter has Six Attachment Points 

 1 Attachment Point on Each 10’ Side

 2 Attachment Points on Each 20’ Side

20’ Side

(Fig A)

(Fig C)

(Fig B)

SET UP

OPEN E-Z UP

®

 Shelter

1.

 

With a partner on the opposite 10' side, grasp the bottom of the diamond-shaped area of outer trusses near 

the “OPEN HERE” sticker. 

(Fig A)

2.

 

Lift the 

Frame

 up slightly and step backward until the shelter is almost fully opened. Gently shake the shelter

while opening. Be careful not to pinch fingers!

Secure Auto-Slider

®

 Pull Pin

3. 

Fold up the

 Fabric Top

 corner to expose the Auto-Slider

®

 Pull Pin. 

(Fig B)

4. 

Lift shelter corner slightly off the ground and engage the Auto-Slider

®

 Pull Pin by pushing up on the 

Frame

 

side trusses with one hand while holding down the top of the 

Frame

 leg with the other hand. 

The pins will auto-engage when aligned with the holes on the frame legs.

5. 

After the Auto-Slider

®

 Pull Pin has locked into place, pull the 

Fabric Top

 down over the frame leg, making 

sure to align and secure the hook and loop strips on the 

Fabric Top

 to the 

Frame

Repeat on all remaining corners.

Extend & Secure Frame Legs (Fig C)

6. 

With a partner, lift the two adjacent outer legs up off the ground simultaneously to about waist height. 

7. 

Slide the lower/inner legs out until the leg adjustment toggle buttons lock at selected height on each leg.

Note: There are 5 adjustment settings on each leg.

8. 

Lower middle leg until the toggle button locks.

9. 

Repeat on the remaining legs.

Note: It is recommended that you use genuine E-Z UP

®

 Deluxe Weight Bags and/or Heavy-Duty Stake Kits to secure your shelter.

 
 

Top of Frame Leg

Fabric Top Corner

Auto-Slider

®

 Pull Pin

WHAT’S IN THE BOX

(1) 10’x20’ Vantage

TM

 Frame, (1) Recreational Grade Top, (1) 6-Piece Spike Kit and (1) Wide-Trax

TM

 Roller Bag

 

INSTRUCTIONS FOR

Frame

Fabric Top Frame

OPEN HERE

OPEN HERE

Toggle Leg Adjuster

Frame

Fabric Top

ezup.com

800-45-SHADE

INTERNATIONAL E-Z UP, INC.

1900 Second St., Norco, California 92860

The #1 Instant Shelter

®

 Brand in the World

Reviews: