
1. Crop out done as per template.
2. Arrow on spindle hub points to lever/hinges.
3. If changing handing, ensure plastic washers re-installed and
fixing screw hand tightened.
4. Check rubber gasket installed correctly, with
lugs pressed in tight, to ensure seal around
backplate edge.
5. Ensure split pin is installed, securing spindle
to spindle hub.
6. Ensure screw casing bolts and through bolts tightened.
7. Ensure power cable wire installed correctly and not bent or
crimped in door.
8. Check batteries installed in correct position.
Professionally Installed by:
PIN code: Date:
_________________________
____________ ____/____/____
9 - S e r i e s
Summary Check List:
For further details see pages 8-12
Top
Summary of Contents for 9-Series
Page 1: ...905 915 User Manual...
Page 38: ...Notes 9 S e r i e s...
Page 39: ...Notes 9 S e r i e s...
Page 40: ...9 S e r i e s User Manual E LOK com Version 2112 E9UM...