8
2. Basic function operation
2.1 On/off Switching navigation
2.1.1 Start
Before start
,
Please ensure all parts connected well
!
Power on
Equipment start
,
POWER indicator light is red.
2.1.2 Power off
User can power off the device by using remote controller
、
keyboard and mouse.
2.1.3 By remote controller:
Press Power button, the Shut down window will appear, click OK, the unit will power
off after a while.
2.1.4 Disconnect the power by keyboard and mouse
:
Step1: enter into Menu, then select “System Shut Down” icon, the Shut down window
will appear
Step2: click OK, the unit will power off after a while.
Step3: disconnect the power
2.2
Login
Equipment start ,
【
POWER
】
indicator light bright. initial password is blank. After
equipment start press
【
MENU
】
key on panel or press right key on mouse, trun to login
interface as below:
Pic2-1 User login
After Input matching user name and password,you can enter system to setup and
operation.
Live preview interface:
eLineTechnology.com