26
E-flite S.E.5a Slow Flyer ARF Assembly Manual
13. Cross the rigging between the cabane struts.
14. The rigging is then routed to the lower rear of the
outer strut as shown.
15. Next, route the rigging from the lower rear hole to
the upper front hole in the outer strut.
16. Run the rigging from the upper outer strut through
the front tube in the fuselage.