41
E-flite Piper Pawnee ARF Assembly Manual
Final Assembly
Required Parts
Fuselage
Wing
Wing strut (2)
2mm x 12mm sheet metal screw (6)
Canopy
Y-harness (2)
6-32 x 1/2-inch socket head screw (2)
Required Tools and Adhesives
Canopy glue
Phillips screwdriver: #1, #2
Low-tack masking tape
Hex wrench: 7/64-inch
Threadlock
Hobby knife
Medium CA
1/16-inch (1.5mm) drill bit or T-pin
1. Use a hobby knife to remove the covering to expose
the blind nuts for the landing gear.
2. Attach the landing gear to the fuselage using
two 6-32 x 1/2-inch socket head screws and a
7/64-inch hex wrench. Use threadlock on the screws
to prevent them from vibrating loose in flight.