![E-FLITE Cap 232 BP 3D Assembly Manual Download Page 32](http://html1.mh-extra.com/html/e-flite/cap-232-bp-3d/cap-232-bp-3d_assembly-manual_3117540032.webp)
14. The installation of the elevator linkage follows
the same procedure as the aileron linkage. The
only difference is you will be using the medium
8
1
/
2
" (215mm) length carbon pushrod linkage
during assembly.
15. The last linkage to install is for operating
the rudder. The long 9
7
/
8
" (250mm) carbon
pushrod is used for the rudder.
32