9.1- Initial Start-Up

- First  of  all,  the  electrical  connection  of  combi  boiler  should  be  made.  The  electrical

connection of the device must be connected to a grounded supply line that can supply

sufficient voltage for the device.

-

All radiator valves are opened.

-

The radiator outlet-return valves of the combi boiler must be open.

-

After these operations, the filling valve is slowly opened to start water filling.

-

The filling process is continued until the water pressure read on the device screen is

between 1.5 to 2 bar and then the valve is closed.

-

When the water pressure rises above 0.8 bar, the combi boiler switches to automatic air purge

mode, and “AP” is displayed on the device. In this case, the RESET button should never  be

pressed  and  it  should  be  waited  for  the  16-second  air  purge  process  to complete.

During commissioning, the pressure on the pressure gage should be checked frequently. If the

pressure drops frequently, there is a leak in the water installation.

-

To discharge air from the central heating installation, the air purgers of the radiator are

loosened and the air is allowed to discharge until water comes out. This is done for all

radiators.

-

The  pressure  is  rechecked  via  the  LCD  screen.  The  filling  valve  is  opened  and  the

pressure is allowed to reach 1.5-2 bar.

-

Whether there is air in the central heating installation is checked from the radiator air

purgers. For fully efficient heating,

 

all air must be evacuated from the installation.

-

Finally, check for any leaks in the radiator and installation pipes

.

-

Check the domestic water installation by opening the hot water tap. Check for are any

leaks in the installation pipes.

-

The initial start-up of the device must be performed by the authorized service.

-

After the installation and initial start-up operations of the device are completed, ask the

authorized service for information about how to operate the device and the safety devices.

Ask for information for econiomic and comfortable use of the device in Eco/Comfort modes.

9.2- Turning Off the Device

You can turn off the combi boiler by holding the On/Off button for 3 seconds. The screen will turn

off in 1 minute.

Anti freeze protection function remains active.

CAUTION:

 To prevent calcification of the heat exchanger, the pH of the water to 

be used in the combi boiler installation should be between 7.5 to 9.5. If there are 

any aluminum parts in the installa

 

tion, the pH

 

 shoul d be  less than 8.5.  The  

hardness value of the water to be used in combi 

22

Summary of Contents for ARCEUS 12 CH

Page 1: ...ARCEUS ELECTRIC COMBI BOILER ARCEUS 6 9 12 15 18 24 27 kW MT CH ST USER AND INSTALLATION MANUAL...

Page 2: ......

Page 3: ...rams 8 5 4 Detailed View Component List and Installation 12 6 PACKAGING 15 7 ASSEMBLY 15 7 1 Selection of Device s Assembly Location 15 7 2 Wall Mounting of the Device 16 8 CONNECTIONS 17 8 1 Water Pi...

Page 4: ...se from material and workmanship provided that the instructions and warnings in the installation and operation manual are followed The commissioning operation must be carried out by the E C A authoriz...

Page 5: ...on and within the operating pressure range of installation so that freeze protection would be activated The freeze protection remains active even if the device is in OFF closed position 4 4 Commission...

Page 6: ...t breaker Anti freeze Protection for both Central Heating and Domestic Water Circuit Domestic Water Flow Control Pump Jamming Safety 3 Way Valve Jamming Safety Automatic Air Purge Expansion Tank 8 lit...

Page 7: ...US 12 15 18 24 27 MT ARCEUS Monothermic Electric Combi Boiler ARCEUS 6 9 12 15 18 24 27 CH ARCEUS Central Heating Electric Combi Boiler ARCEUS 6 9 12 15 18 24 27 ST ARCEUS Central Boiler Aided Electri...

Page 8: ...at CH Flow NTC CH Return NTC Boiler Tank NTC DHW Solar STB Water Pressure Sensor DHW Outlet Sensor Modbus Communication Cascade Board Wi Fi Board Connection Modulating Room Thermostat Programmable Tim...

Page 9: ...w NTC CH Return NTC Boiler Tank NTC DHW Solar STB Water Pressure Sensor DHW Outlet Sensor Modbus Communication Cascade Board Wi Fi Board Connection Modulating Room Thermostat Programmable Timer Outdoo...

Page 10: ...NTC CH Return NTC Boiler Tank NTC DHW Solar STB Water Pressure Sensor DHW Outlet Sensor Modbus Communication Cascade Board Wi Fi Board Connection Modulating Room Thermostat Programmable Timer Outdoor...

Page 11: ...at CH Flow NTC CH Return NTC Boiler Tank NTC DHW Solar STB Water Pressure Sensor DHW Outlet Sensor Modbus Communication Cascade Board Wi Fi Board Connection Modulating Room Thermostat Programmable Tim...

Page 12: ...ck 4 Neutral Terminal Block 5 Neutral Busbar 6 Cantactor 7 3 Way Valve 8 3 Bar Safety Valve 9 Electric Heaters 10 Main Heat Exchanger 11 Expansion Vessel 12 Drain Valve 13 Plate Heat Exchanger 14 Circ...

Page 13: ...Control Board Figure 6 Control Panel Elements Figure 6 1 Control Board Rear Cover and Terminal Connections 13...

Page 14: ...4 1 MT Model Installation Figurel 7 Monothermic Device Installation Scheme 5 4 2 CH Model Installation Figure 8 CH Device Installation Scheme DHW Outlet DHW Inlet CH Flow CH Flow CH Return CH Return 1...

Page 15: ...dimensions of 735 x 345 x 490 HxWxD as supported by lower and upper styrofoams Boiler Exit CH Exit CH Return Boiler Return 7 1 Selection of Device s Assembly Location The location where the device can...

Page 16: ...as bathtubs shower cabinets and must be assembled at least 50 cm away from these areas Since the outer surface temperature of the device does not exceed 85 C at maximum heating power no special protec...

Page 17: ...3 4 outlet line hot b Domestic water pipe 1 2 outlet line hot c Domestic water pipe 1 2 inlet line cold d Central heating pipe 3 4 return line cold A suitable sized valve should be installed in the w...

Page 18: ...e hot b Boiler outlet line 1 2 hot c Boiler return line 1 2 cold d Installation Filling line 1 2 e Central heating pipe 3 4 return line cold a b c d e Figure 14 ST boiler water connections 8 1 2 HCH M...

Page 19: ...e device for overcurrent protection In case the circuit breaker trips call an authorized service 8 2 Electrical Connection Your combi boiler must be connected to a grounded power line that can supply...

Page 20: ...9 CH ST Single phase 3x10 39 B40 1P Three phase 5x2 5 13 B15 3P ARCEUS 12 MT CH ST Single phase 3x10 52 B63 1P Three phase 5x4 17 B20 3P ARCEUS 15 MT CH ST Three phase 5x6 22 B25 3P ARCEUS 18 MT CH S...

Page 21: ...hermostat T6360 7006907804 E C A Smart Combi Boiler Kit 7006907531 E C A Digital Room Thermostat Cordless Programmable CM727 7006902046 Poly 100 W Room Thermostat 7006903001 E C A Digital Room Thermos...

Page 22: ...er comes out This is done for all radiators The pressure is rechecked via the LCD screen The filling valve is opened and the pressure is allowed to reach 1 5 2 bar Whether there is air in the central...

Page 23: ...ith the central heating circuit temperature increase button the temperature of the heating water in the central heating circuit can be increased to 80 C Domestic Water Temperature Decrease Button With...

Page 24: ...ssword value at parameter menu entry Reduces parameter value Indicates information value Indicates error history value Figure 18 Control Panel Button Configuration 10 2 1 Button Functions K5 K6 K1 K3...

Page 25: ...andby Mode Off Mode It is the mode in which the device can be set to standby mode In this mode central heating and domestic water heating demands cannot be met 10 3 2 Summer Mode In this mode the devi...

Page 26: ...is mode is activated are listed below When the device is powered for the first time or after the power goes out and comes back After a reset process following the overheating error After a high water...

Page 27: ...ture reaches to 15 C Below conditions must be provided and controlled by the customer for anti freze protection to work properly Power supply of the device must bu connected Radiator valves must be op...

Page 28: ...d by pressing the RESET button L43 Water Pressure Sensor Error This error is displayed if the pressure sensor is short or open circuit or damaged When this error is cleared normal operation begins L47...

Page 29: ...hibitor Sentinel X400 etc should be added to the installation water 12 3 Cleaning of Combi Boiler Keep the outer casing of the combi boiler clean by wiping it with a soft damp cloth Do not use strong...

Page 30: ...1 3x10 1 3x10 Power Cord CrossSec on mm 5x6 5x6 5x6 5x10 3 5x2 5 3 5x2 5 3 5x4 Protec on Class IPX4D IPX4D IPX4D IPX4D IPX4D IPX4D IPX4D Sound Level dB 42 42 38 38 38 38 38 Net Weight kg 26 26 27 27 2...

Page 31: ...odel identifier Space Heating Temperature application Medium Efficiency Class Water Heating Load Profile Rated heat output Prated ARCEUS Combi ERP Units CH ST Model Supplier s name or trademark E C A...

Page 32: ...8 U O U n n n n n n nmn n n 9 8 1 6 2 00 1 4 0 3 1 6 5 0 2 9 8 6 6 7 00 2 1 0 3 2 6 2 0 1 4 8aYU8Rna 8 nJ 8cLUFn U Fln E M U ln MUn n n 0 n Bnc8Wn 9cLUFnMan8 Yi n nga n n 81U U8 U BU U U U E U UP F 4...

Page 33: ...33...

Page 34: ...vl8 rvl X7 7 Lv Xh X EZ4T e i 4lz rlh7 l Y 4 h vR I4Y h5 lh4 Xh _ 7 Xh Xd7XhR VY J4Y h4 Y h4 7 0 Q H4 mv 4T T l Xh T 7Y X Xlh e h9 T 7Xe h Ylk hS kFc 4T v 4 vX X4 T lB W v T hS qvR J4X h4 lB T 4lf1 h...

Page 35: ...erial Number Submit Date and Location Maximum Repair Time 20 Work Days Warranty Time 3 Years AUTHORIZED SERVICE Title Address Tel Fax Assembly Date Date Signature and Seal FREE INITIAL START UP COUPON...

Page 36: ...PRODUCTION Organize Sanayi Bolgesi 3 Kisim Mustafa Kemal Boulevard No 13 45030 MANISA Tel 90 236 213 00 21 Fax 90 236 213 08 59 email emas emas com tr www emas com tr 7006910085 2 0...

Reviews: