background image

22-082  

 

 

www.powercommander.com

2017-2019 Yamaha T-Max 530 - PCV F/I - 4

Install the PCV module on the left side of the fuel tank (Fig. D).

 

Use the supplied Velcro to secure the module. Clean surfaces with the alcohol 
swab before attaching.

Secure the PCV ground wire to the engine using the engine side cover bolt 
shown in Figure D.

Locate and unplug the stock Crank Position Sensor connectors on the left side 
of the scooter (Fig. E).

 

This is a 2-pin connector pair located next to the belt cooling filter.

Route the pair of PCV connectors with BROWN colored wire to this area 
and plug the PCV wiring harness in-line of the stock Crank Position Sensor 
connectors (Fig. F).

FIG.F

FIG.E

FIG.D

Ground

Unplug

Reviews: