![Dynatup 8250 Operating Instructions Manual Download Page 9](http://html.mh-extra.com/html/dynatup/8250/8250_operating-instructions-manual_2549225009.webp)
Preliminary Pages
ix
List of Figures
Figure
Figure
Page
Page
Figure 1-1. Dynatup 8250 Drop Tower ........................................................................ 1-3
Figure 3-1. Foundation Layout .................................................................................... 3-2
Figure 3-2. Uncrating .................................................................................................. 3-4
Figure 3-3. Motor Enclosure ........................................................................................ 3-7
Figure 4-1. Control Pendent ........................................................................................ 4-2
Figure 4-1. Motor Enclosure ........................................................................................ 4-4
Figure 5-1. Velocity Detector Flag .............................................................................. 5-2
Figure 5-2. Velocity Detector and Flag ...................................................................... 5-3
Figure 5-3. Shock Absorber and Stop Block Setup ..................................................... 5-4
Figure 5-3. Installing the Add-on Weights .................................................................. 5-6
Figure 7-1. Lubrication Points ...................................................................................... 7-4
Figure 7-2. Hoist Hub and Pinch Roller Assembly ........................................................ 7-6
Summary of Contents for 8250
Page 1: ... M14 13655 EN Operating Instructions Instron Dynatup 8250 Drop Weight Impact Tester ...
Page 10: ...Preliminary Pages M14 13655 EN x ...
Page 29: ...Connecting Utilities and Initial Set up 3 7 Installation Figure 3 3 Motor Enclosure ...
Page 34: ...Initial Machine Operation and Checkout M14 13655 EN 3 12 ...
Page 49: ...6 1 Operation Chapter 6 Chapter 6 Operation Outline Performing a Test 6 2 ...
Page 54: ...Performing a Test M14 13655 EN 6 6 ...
Page 58: ...Scheduled Maintenance M14 13655 EN 7 4 Figure 7 1 Lubrication Points LUBRICATION POINTS ...
Page 62: ...Troubleshooting M14 13655 EN 7 8 ...
Page 64: ...Glossary M14 13655 EN A 2 ...