D 40 29
Screed control with paver finisher stop - floating stop with relief
As for charging/relieving, a pressure of 2-50 bar can be individually applied to the
screed lifting cylinders. This pressure acts to combat the weight of the screed to pre-
vent the screed from sinking into the freshly laid material.
The pressure to be applied depends on the load-bearing capacity of the material.
If necessary, the pressure must be readjusted or changed as required during the first
stops until the lower edge of the screed no longer leaves any marks when the finisher
moves on again.
As of a pressure of approx. 10-15 bar, the weight of the screed is neutralised, thus
preventing the screed from possibly sinking into the material.
A
The pressure is set to approx. 20 bar in the factory.
Adjusting the pressure
Pressure adjustments can only be made while the diesel engine is running. Therefore:
- Start the diesel engine and set the traction controller (3) to zero.
- Set switch (2) to "Floating position".
Set pressure for screed charging
or relieving
- Swivel the drive lever (4) out.
- Set switch (1) to position A (relieving)
or C (charging).
- Set pressure with pressure control valve
(5); read off at the manometer (6).
A
When screed charging/relieving is nec-
essary and automatic levelling is used
(grade control and/or slope control),
the compacting performance changes
(layer thickness).
A
The pressure can also be set or correct-
ed during paving.
(Max. 50 bar)
0
80
20
100
1400
1200
1000
800
600
400
200
psi
bar
CN 837
20
6
5
Summary of Contents for F2500C
Page 2: ...www dynapac com...
Page 12: ...10...
Page 26: ...A 2...
Page 34: ...B 8 4 Safety devices 1 3 5 10 7 9 11 4 5 6 7 12 2 8...
Page 46: ...B 20 71 70 40 41 42 xxxxxxxxxxxxxxxxx 9 10 9 10 7 7...
Page 88: ...C 10 26...
Page 92: ...D 10 4 10 15 16 19 18 20 17 14 11 12 13 10 21 22...
Page 94: ...D 10 6 10 15 16 19 18 20 17 14 11 12 13 10 21 22...
Page 96: ...D 10 8 10 15 16 19 18 20 17 14 11 12 13 10 21 22...
Page 98: ...D 10 10 24 23...
Page 100: ...D 10 12 28 26 27 25...
Page 102: ...D 10 14 28 26 27 25...
Page 104: ...D 10 16 30 29...
Page 106: ...D 10 18 32 31...
Page 108: ...D 10 20 34 35 33...
Page 110: ...D 10 22 37 36...
Page 112: ...D 10 24 39 38...
Page 114: ...D 10 26 40 41 42 43...
Page 116: ...D 10 28 44 46 47 45...
Page 118: ...D 10 30 77 78 79 80 81 82 83 70 71 72 73 74 75 76...
Page 120: ...D 10 32 77 78 79 80 81 82 83 70 71 72 73 74 75 76...
Page 122: ...D 10 34 2 2 Truck Assist System o 84 85 86 87 88 A...
Page 124: ...D 10 36 84 85 86 87 88...
Page 126: ...D 10 38 84 85 86 87 88...
Page 130: ...D 10 42 90 91 92 94 93 95 96 96...
Page 132: ...D 10 44...
Page 137: ...D 30 5 Control platform moveable o 9 6 2 5 7 4 3...
Page 140: ...D 30 8 Protective cabin o A D B C B A C D 1 3 4 5 2...
Page 181: ...D 40 5 1 3 10 2 8 9 6 7 4 5...
Page 183: ...D 40 7 1 3 10 2 8 9 6 7 4 5...
Page 186: ...D 40 10 2 1...
Page 188: ...D 40 12 2 3 1...
Page 190: ...D 40 14 1 2 5 7 6 3...
Page 192: ...D 40 16 2 2 3 1 5 4...
Page 196: ...D 40 20 5 4 A 2 1 3...
Page 198: ...D 40 22 3 1 4 8 9 2 5 7 6 10 11...
Page 202: ...D 40 26 1 2 B A C A C...
Page 204: ...D 40 28 1 2 B A C A C 3 4...
Page 206: ...D 40 30 1 2 B A C A C 3 4...
Page 208: ...D 40 32 1 2...
Page 210: ...D 40 34 1 3 10 9 2 8 7 6 5 4...
Page 212: ...D 40 36 2 Malfunctions 2 1 Error code query for engine 3 1 2...
Page 216: ...D 40 40 2 2 Error codes...
Page 217: ...D 40 41...
Page 218: ...D 40 42...
Page 219: ...D 40 43...
Page 220: ...D 40 44...
Page 221: ...D 40 45...
Page 222: ...D 40 46...
Page 239: ...E 10 11 Symbol Meaning Outer auger bearing Auger end bearing...
Page 269: ...E 10 41 6 Automatic steering unit 20 2 1 3 6 7 8 4 12 9 10 5 11 17 18 15 16 14 21 13 19...
Page 279: ...E 10 51 Dimensions bucket MH2550 long version 3690 2070 1320 1470 3690 3020 2070 1930 3000...
Page 286: ...E 10 58 Lashing 1 2...
Page 288: ...E 10 60 Loading with the crane MH2500 A 1 2 3...
Page 289: ...E 10 61 Loading with the crane MH2550 1 2 3 B...
Page 291: ...E 10 63 Lash the bucket in the paver 1 4 3 2...
Page 293: ...E 10 65 Operation 2 1 1 7 A B 5 4 6 3 6 8 9 10...
Page 298: ...E 10 70...
Page 301: ...F 20 1 F 20 Maintenance review 1 Maintenance review 73 40 50 80 90 100 30 60...
Page 303: ...F 30 1 F 30 Maintenance conveyor 1 Maintenance conveyor...
Page 310: ...F 30 8...
Page 311: ...F 40 1 F 40 Maintenance auger assembly 1 Maintenance auger assembly...
Page 339: ...F 60 1 F 60 Maintenance hydraulic system 1 Maintenance hydraulic system...
Page 354: ...F 60 16...
Page 355: ...F 73 1 F 73 Maintenance drive units 1 Maintenance drive units...
Page 368: ...F 73 14...
Page 369: ...F 80 1 F 80 Maintenance electrical system 1 Maintenance electrical system...
Page 378: ...F 80 10 Fuses in terminal box B 15 10 15 25 15 10 15 25 15 10 10 15 25 15 15 10 25 10...
Page 380: ...F 80 12 Relays in terminal box C 15 10 15 25 15 10 15 25 15 10 10 15 25 15 15 10 25 10...
Page 383: ...F 80 15 Relays in the engine compartment E K 0 Engine start...
Page 384: ...F 80 16...
Page 392: ...F 90 8...
Page 393: ...F 100 1 F 100 Tests stopping 1 Tests checks cleaning stopping...
Page 404: ...F 110 2 2 4 7 5 6 6 3 1...
Page 410: ...www dynapac com...