D 30 35
Screed eccentric adjustment
To pave thicker layers of material, if the
piston rods in the levelling cylinder are
operating close to their limit position and
if the desired paving thickness cannot be
reached, it is possible to alter the ap-
proach angle of the screed by adjusting
the eccentric.
- Pos. I:
Paving thickness up
to approx. 7 cm
- Pos. II
Paving thickness of approx.
7 cm to approx. 14 cm
- Pos. III
Paving thickness above
approx. 14 cm
- The spindle (1) is not adjusted.
- Unfasten locks (2) for eccentric adjustment.
- Swivel screed to the desired position using the lever (3), and engage the locking
knob again.
A
If the levelling unit is connected to a height controller, this has the function of balanc-
ing out any rapid rise in the screed position: The levelling cylinders are extended until
the correct height is reached.
- The change in approach angle can only take place slowly and uniformly on both
sides at once during paving operation, and involves the use of eccentric adjust-
ments. Failing this, any rapid response in the screed could easily cause waves to
appear on the road surface.
The setting process should therefore take place before work starts!
A
When equipped with rigid screed, the second hole (4) is intended for (item I).
3
2
III
II
I
1
4
Summary of Contents for F2500C
Page 2: ...www dynapac com...
Page 12: ...10...
Page 26: ...A 2...
Page 34: ...B 8 4 Safety devices 1 3 5 10 7 9 11 4 5 6 7 12 2 8...
Page 46: ...B 20 71 70 40 41 42 xxxxxxxxxxxxxxxxx 9 10 9 10 7 7...
Page 88: ...C 10 26...
Page 92: ...D 10 4 10 15 16 19 18 20 17 14 11 12 13 10 21 22...
Page 94: ...D 10 6 10 15 16 19 18 20 17 14 11 12 13 10 21 22...
Page 96: ...D 10 8 10 15 16 19 18 20 17 14 11 12 13 10 21 22...
Page 98: ...D 10 10 24 23...
Page 100: ...D 10 12 28 26 27 25...
Page 102: ...D 10 14 28 26 27 25...
Page 104: ...D 10 16 30 29...
Page 106: ...D 10 18 32 31...
Page 108: ...D 10 20 34 35 33...
Page 110: ...D 10 22 37 36...
Page 112: ...D 10 24 39 38...
Page 114: ...D 10 26 40 41 42 43...
Page 116: ...D 10 28 44 46 47 45...
Page 118: ...D 10 30 77 78 79 80 81 82 83 70 71 72 73 74 75 76...
Page 120: ...D 10 32 77 78 79 80 81 82 83 70 71 72 73 74 75 76...
Page 122: ...D 10 34 2 2 Truck Assist System o 84 85 86 87 88 A...
Page 124: ...D 10 36 84 85 86 87 88...
Page 126: ...D 10 38 84 85 86 87 88...
Page 130: ...D 10 42 90 91 92 94 93 95 96 96...
Page 132: ...D 10 44...
Page 137: ...D 30 5 Control platform moveable o 9 6 2 5 7 4 3...
Page 140: ...D 30 8 Protective cabin o A D B C B A C D 1 3 4 5 2...
Page 181: ...D 40 5 1 3 10 2 8 9 6 7 4 5...
Page 183: ...D 40 7 1 3 10 2 8 9 6 7 4 5...
Page 186: ...D 40 10 2 1...
Page 188: ...D 40 12 2 3 1...
Page 190: ...D 40 14 1 2 5 7 6 3...
Page 192: ...D 40 16 2 2 3 1 5 4...
Page 196: ...D 40 20 5 4 A 2 1 3...
Page 198: ...D 40 22 3 1 4 8 9 2 5 7 6 10 11...
Page 202: ...D 40 26 1 2 B A C A C...
Page 204: ...D 40 28 1 2 B A C A C 3 4...
Page 206: ...D 40 30 1 2 B A C A C 3 4...
Page 208: ...D 40 32 1 2...
Page 210: ...D 40 34 1 3 10 9 2 8 7 6 5 4...
Page 212: ...D 40 36 2 Malfunctions 2 1 Error code query for engine 3 1 2...
Page 216: ...D 40 40 2 2 Error codes...
Page 217: ...D 40 41...
Page 218: ...D 40 42...
Page 219: ...D 40 43...
Page 220: ...D 40 44...
Page 221: ...D 40 45...
Page 222: ...D 40 46...
Page 239: ...E 10 11 Symbol Meaning Outer auger bearing Auger end bearing...
Page 269: ...E 10 41 6 Automatic steering unit 20 2 1 3 6 7 8 4 12 9 10 5 11 17 18 15 16 14 21 13 19...
Page 279: ...E 10 51 Dimensions bucket MH2550 long version 3690 2070 1320 1470 3690 3020 2070 1930 3000...
Page 286: ...E 10 58 Lashing 1 2...
Page 288: ...E 10 60 Loading with the crane MH2500 A 1 2 3...
Page 289: ...E 10 61 Loading with the crane MH2550 1 2 3 B...
Page 291: ...E 10 63 Lash the bucket in the paver 1 4 3 2...
Page 293: ...E 10 65 Operation 2 1 1 7 A B 5 4 6 3 6 8 9 10...
Page 298: ...E 10 70...
Page 301: ...F 20 1 F 20 Maintenance review 1 Maintenance review 73 40 50 80 90 100 30 60...
Page 303: ...F 30 1 F 30 Maintenance conveyor 1 Maintenance conveyor...
Page 310: ...F 30 8...
Page 311: ...F 40 1 F 40 Maintenance auger assembly 1 Maintenance auger assembly...
Page 339: ...F 60 1 F 60 Maintenance hydraulic system 1 Maintenance hydraulic system...
Page 354: ...F 60 16...
Page 355: ...F 73 1 F 73 Maintenance drive units 1 Maintenance drive units...
Page 368: ...F 73 14...
Page 369: ...F 80 1 F 80 Maintenance electrical system 1 Maintenance electrical system...
Page 378: ...F 80 10 Fuses in terminal box B 15 10 15 25 15 10 15 25 15 10 10 15 25 15 15 10 25 10...
Page 380: ...F 80 12 Relays in terminal box C 15 10 15 25 15 10 15 25 15 10 10 15 25 15 15 10 25 10...
Page 383: ...F 80 15 Relays in the engine compartment E K 0 Engine start...
Page 384: ...F 80 16...
Page 392: ...F 90 8...
Page 393: ...F 100 1 F 100 Tests stopping 1 Tests checks cleaning stopping...
Page 404: ...F 110 2 2 4 7 5 6 6 3 1...
Page 410: ...www dynapac com...