![Dynapac DFP9 Operating Instructions Manual Download Page 83](http://html1.mh-extra.com/html/dynapac/dfp9/dfp9_operating-instructions-manual_2548563083.webp)
4.
Slightly loosen the fastening screws (2) on both sides.
5.
Pull the engine carrier forward, remove and replace the V-
belt (1).
6.
Install the new V-belt and pull the engine carrier back.
7.
Tighten the fastening screws (1) on both sides.
8.
Check tension of V-belt, tighten if necessary.
ð
Compression measurement:
approx. 5 mm (0.2 in).
9.
Assemble the V-belt guard (1) with fastening screws (2).
10.
Check the V-belt tension again after 25 operating hours,
tighten if necessary.
8.8.3.1
Checking the frequency of the base plate
Keep feet and hands clear of the vibrating base plate.
2
B-834-0170
1
Fig. 71
1
B-834-0171
Fig. 72
Fig. 73
B-834-0144
1
2
Fig. 74
Maintenance – Annually
DFP9
83
Summary of Contents for DFP9
Page 2: ...2...
Page 6: ...Table of contents DFP9 6...
Page 7: ...1 Introduction Introduction DFP9 7...
Page 11: ...2 Technical data Technical data DFP9 11...
Page 15: ...3 Concerning your safety Concerning your safety DFP9 15...
Page 38: ...Concerning your safety Signage DFP9 38...
Page 39: ...4 Indicators and control elements Indicators and control elements DFP9 39...
Page 45: ...5 Checks prior to start up Checks prior to start up DFP9 45...
Page 52: ...Checks prior to start up Checking the water level topping up DFP9 52...
Page 53: ...6 Operation Operation DFP9 53...
Page 64: ...Operation Parking the machine in secured condition DFP9 64...
Page 65: ...7 Loading transporting the machine Loading transporting the machine DFP9 65...
Page 69: ...8 Maintenance Maintenance DFP9 69...
Page 100: ...Maintenance As required DFP9 100...
Page 101: ...9 Troubleshooting Troubleshooting DFP9 101...
Page 107: ...10 Disposal Disposal DFP9 107...
Page 109: ...11 List of special tools List of special tools DFP9 109...
Page 111: ......
Page 112: ......