background image

Installation, Operation and Service Manual 

 

LKP Series 

 

 

 

  

 

(referred to as a 4-channel assembly).  A 4-channel system is used here as an illustration 

to simplify the drawing and explanation. 

 

 

 

Figure 6.2  

Functional  Diagram  of  Four-Channel  System 

 

A magnetic null detector (sensor), high-gain current amplifier, and feedback coil are 

combined to form one channel, or current feedback loop.  The function of each current loop 

(current I

1

, I

2

, I

3

, or I

4

) is to maintain a state of zero flux in its related segment of the iron 

core.  A burden shunt placed in series with the total current (I

t

), develops an output voltage 

E

o

, proportional to I

t

.  The common side of the shunt is returned to the four high-gain current 

amplifiers. 
Since the bus current is directly proportional to the total current I

t

 by a ratio of 5000:1, the 

bus current can be measured accurately by summing the independent feedback currents (I

t

 

= I

1

 + I

2

 + I

3

 + I

4

). Therefore, the bus current is equal to 5000I

t

.  Moving the measuring head 

with respect to the bus will cause the values of the individual feedback currents to change 

but will not affect the total current nor the accuracy of the measurement. 

6.4 CIRCUIT 

FUNCTIONS 

For the following discussion refer to the “High Range Module Schematic” and system 

schematic drawings as appropriate.  These drawings are located in the back of the manual. 
Before discussing the various circuit functions, a general description of the metering unit 

will be helpful.  A metering unit may consist of one or more modular units.  Each modular 

unit contains the necessary circuitry for four channels of amplification.  The metering unit 

also contains one main power transformer, circuit breaker, and the resistors or shunts to 

develop output voltages.  A 4-channel system is used here as an illustration to simplify the 

explanation. 

© 2011 DynAmp, LLC       

                       

Page 16 

041837 H

 

Summary of Contents for LKP-8024

Page 1: ...URRENT METERING SYSTEMS Installation Operation and Service Instructions Manual Item No 041837 Rev H DynAmp LLC 3735 Gantz Road Phone 1 614 871 6900 www dynamp com Grove City Ohio 43123 USA Fax 1 614 8...

Page 2: ...Installation Operation and Service Manual LKP Series This Page is Intentionally Blank 2011 DynAmp LLC Page ii 041837 H...

Page 3: ...tion will be determined by DynAmp at DynAmp s sole option Such warranty repair shall constitute a fulfillment of all DynAmp LLC liabilities in respect to said items and components In no event shall Dy...

Page 4: ...Installation Operation and Service Manual LKP Series This Page is Intentionally Blank 2011 DynAmp LLC Page iv 041837 H...

Page 5: ...is manual must be followed The electrical specifications must not be exceeded and the unit must be installed according to directions provided HAZARDOUS VOLTAGE These instructions apply only to retrofi...

Page 6: ...Installation Operation and Service Manual LKP Series This Page is Intentionally Blank 2011 DynAmp LLC Page vi 041837 H...

Page 7: ...urope Telephone 41 22 706 1446 Fax 41 22 706 1311 8 30 AM to 5 00 PM Central European Time From last Sunday in October to last Sunday in March 7 30 GMT to 16 00 GMT From last Sunday in March to last S...

Page 8: ...Installation Operation and Service Manual LKP Series This Page is Intentionally Blank 2011 DynAmp LLC Page viii 041837 H...

Page 9: ...egarding Hall Sensor power supply 3 01 18 24 C Updated Accuracy Diagnostics Spare Parts section 04 02 all Rev D Update to DynAmp LLC 12 04 22 Rev E Update per ECR 1245 Remove 6 3 Five Year Service and...

Page 10: ...Installation Operation and Service Manual LKP Series This Page is Intentionally Blank 2011 DynAmp LLC Page x 041837 H...

Page 11: ...PROCEDURE 10 5 6 INITIAL SYSTEM CHECKOUT 11 6 THEORY OF OPERATION______________________________________________ 15 6 1 GENERAL 15 6 2 MAGNETIC SENSOR NULL DETECTOR 15 6 3 SYSTEM DESCRIPTIONS 15 6 4 CI...

Page 12: ...Functional Diagram of Four Channel System 16 Table Title Page Table 4 1 LKP 8024 Specifications 7 Table 5 1 Measuring Head Resistance Chart LKP 8024 13 Table 5 2 Form for Recording Channel Voltage Me...

Page 13: ...ed for locking the doors Only authorized personnel or technicians should be allowed to open and service the unit Make sure that the cables are disconnected from the head during installation Replace fu...

Page 14: ...the rain or under water or submerge any part of the head or meter unit Use of the equipment in a manner not specified by the manufacturer can impair the protection provided within DynAmp does not ass...

Page 15: ...dequate protection from precipitation rain snow ice and direct water contact Adequate shelter must be provided to prevent the accumulation of precipitation rain snow ice and water which can lead to th...

Page 16: ...Installation Operation and Service Manual LKP Series This Page is Intentionally Blank 2011 DynAmp LLC Page 4 041837 H...

Page 17: ...kit contains two LKP 8000 modules and a kit of parts required to complete installation The modules replace the existing 24FM Metering Unit modules and the remaining components are mounted along with...

Page 18: ...Installation Operation and Service Manual LKP Series This Page is Intentionally Blank 2011 DynAmp LLC Page 6 041837 H...

Page 19: ...ull scale Voltage output 1V at full scale bus current 0 1 full scale Accuracy Diagnostics Relay Normally closed 60 VDC 2A or 30 Vrms AC 2A PHYSICAL Overall Dimensions in mm LKP Signal Converter Module...

Page 20: ...Installation Operation and Service Manual LKP Series This Page is Intentionally Blank 2011 DynAmp LLC Page 8 041837 H...

Page 21: ...should be inspected for shipping damage at the earliest opportunity Visible damage must be reported to the carrier immediately Concealed damage not evident until the system is operated must be report...

Page 22: ...Metering System to the new LKP 8024 is described in the following steps Prior to shutting down the old system record the As Found channel voltages for comparison later to the After Conversion voltages...

Page 23: ...spond to channel locations shown for the measuring head e Excluding the effects of external magnetic sources and assuming a bus current of 100 kA each channel is expected by calculation to measure app...

Page 24: ...es to the maximum heat dissipation that the channel can safely handle A reading of 30 V to 40 V makes a change in head position highly desirable A reading exceeding 40 V makes a head position change n...

Page 25: ...urrent Channels 4 5 6 11 12 3 6 Hall Signal Channel 4 13 16 3 6 Hall Signal Channel 5B 17 18 3 6 Hall Signal Channel 6 30 34 10 12 Coil Circuit Channel 4 31 35 10 12 Coil Circuit Channel 5 32 36 10 12...

Page 26: ...channel voltages may vary widely with temperature extremes the accuracy will remain unaffected so long as each channel voltage falls within the limits of 3V to 40Vdc Channel voltages are measured betw...

Page 27: ...d contains many magnetic sensors and feedback coils Each set of sensors and the adjacent coils plus the associated amplifying section of the Signal converter is termed a channel Each channel responds...

Page 28: ...be measured accurately by summing the independent feedback currents It I1 I2 I3 I4 Therefore the bus current is equal to 5000It Moving the measuring head with respect to the bus will cause the values...

Page 29: ...itry The first module in the meter unit also referred to as Module 1 includes a 12 Vdc power supply for the Hall devices 6 7 SYNC PLL AND RAMPS The Signal converter employs phase locked loop circuitry...

Page 30: ...s the associated SCRs SCR pack 1 for channel 1 6 11 ACCURACY DIAGNOSTICS ACCURACY DIAGNOSTICS AD is a system that assures the user that most internal circuits are operating properly and it is also a d...

Page 31: ...e metering unit has four channel LEDs and 2 power supply monitoring LEDs The following is a description of their functionality A Line This LED indicates whether the supply voltage to the meter unit fa...

Page 32: ...the channel LEDs should be ignored Note that in general the metering unit s 0 1 accuracy is only guaranteed when the primary bus current is above 5 of the full scale rating of the unit A relay contact...

Page 33: ...ormance Use appropriate measures to correct any problems found A Repeat voltage measurements given in Magnetic Centering procedure to ensure that no significant change has occurred from the data recor...

Page 34: ...es not specify required intervals of calibration for its products The end user of the product is responsible for identifying the appropriate interval between calibrations The intervals should be deter...

Page 35: ...IPTION ITEM NO QTY Signal converter Kit Spare Parts LKP 8024 43808 1 Kit includes Module Power supply lamps fuses as one package Module LKP 4 channel electronics 41350 1 Power Supply 12V 19658 1 Bulb...

Page 36: ...ope Telephone 41 22 706 1446 Fax 41 22 706 1311 8 30 AM to 5 00 PM Central European Time From last Sunday in October to last Sunday in March 7 30 GMT to 16 00 GMT From last Sunday in March to last Sun...

Page 37: ...ces TEC727 9907 LKP LKB LKP and LKB Sensor Mounting Guidelines and Restrictions 9905 LKP LKB Recommended Calibration Intervals for LKP or LKB High Current Systems 9904 Diagnostics Self Diagnostics for...

Page 38: ...Installation Operation and Service Manual LKP Series This Page is Intentionally Blank 2011 DynAmp LLC Page 26 041837 H...

Page 39: ...2 Assembly LKP 8024 Retrofit 84B108417 Assembly Control PC Board 75A108104 Assembly Supply SCR Drive 75B108106 Assembly Accuracy Diagnostics 07A109083 Assembly CM 4 Ch Alarm PC Board 26A107145 Assembl...

Reviews: