19
Dymax SG-200 High-Flow Spray Gun System User Guide
Connect Air Line to Reservoir
Connect the air line from the material pressure regulator (air out) to the air inlet fitting on the precision
regulator on the tank cover (Figure 9).
Inserting the Bottle Reservoir in the Tank
1.
Remove the cover from the bottle reservoir tank by loosening the cover hold-down knobs.
2.
Unscrew the cover from a 0.26-gal (1-L) or 0.5-gal (2-L) bottle reservoir and place the reservoir into the
tank. Complete this step quickly to prevent initiation and curing of light-sensitive fluids.
3.
Install the tank cover on the tank, ensuring the dip tube is inserted to the bottom of the bottle reservoir.
Complete this step quickly to prevent curing of light-sensitive fluids.
4.
Tighten the cover hold-down knobs evenly to ensure uniform sealing.
C
—
Pail Reservoir Systems
NOTE:
Ensure that you plumb the air lines correctly at the inlets and outlets of the dispensing system
components. The dispensing system will not function properly if the compressed air lines are plumbed
incorrectly.
WARNING!
Some Dymax fluids can bond skin together in seconds. It can also irritate skin,
eyes, and mucous membranes. To minimize the risk of bonded skin or irritation, wear protective
gloves and eyewear when working with Dymax fluids and the hand-held spray gun system.
Exposing Dymax adhesives to light causes most Dymax adhesives and fluids to begin curing.
Hence, to prevent unintentional curing during the loading of pail reservoirs, have the reservoir
tank ready to accept the pail reservoir and complete the loading process quickly after opening the
pail reservoir.
Figure 10. Pail Reservoir Connections
Air line
–
Connects from Material Pressure
Regulator to Tank Filter.
Fluid Line