background image

CDC-TW-0502-1-ACB

 

CDC-TW-0502-1-ACB

9/20

99.827.08 1.0/02/17

English

- Mount the drives whilst under zero stress. With

that, an even load distribution is provided by all

the drive chains.

- At vertical active pulling application (e.g. for a

skylight) the forces must be rearranged by

software SCS.

- If after mounting, the distance X is greater than 23

mm, null balance with software SCS is neccesary.

Closure Ranges will shift in relation to new zero

point.

Mounting information

≥ 23 mm ? 

X

ACB bus interface

ACB is used for secure communication between the 

drive  and  compatible  D+H  control  systems.  It 

enables  activation,  diagnostics  and  configuration 

with perfect position, directly from the control panel. 

In  this  process,  all  status  messages,  such  as  the 

OPEN  and  CLOSED  signals,  opening  stroke  and 

drive errors, are transmitted to the control panel.

Functional description

Electrical devices, accessories, batteries and packa-

ging  should  be  sorted  for  environmental-friendly 

recycling.  Do  not  dispose  electrical  devices  and 

batteries into household waste!

Only for EC countries:

According the European Guideline 2012/19/EU for 

waste  electrical  and  electronic  equipment  and  its 

implementation into national right, electrcal devices 

that are no longer usable must be collected separa-

tely and disposed of in an environmentally correct 

manner.

Disposal

Declaration of Conformity

We  declare  under  our  sole  responsibility  that  the 

product  described  under  “Technical  Data”  is  in 

conformity with the following directives:
2014/30/EU, 2014/35/EU
Technical file at:

D+H Mechatronic AG, D-22949 Ammersbek
Dirk Dingfelder

Maik Schmees

Member of the Board 

Authorized signatory, Technical Director

21.02.2017

Maintenance and cleaning

Maintenance work is only allowed when the device is in

a de-energized condition! Inspection and maintenance 

has to be carried out according to D+H maintenance 

notes.  Only original  D+H  spare  parts  may  be used. 

Repair is to be carried out exclusively by D+H.

Wipe away debris or contamination with a dry, soft 

cloth.

Do not use cleaning agents or solvents.

Guarantee

You will get 2 years guarantee for all D+H products 

from date of verified handing over of the system up to 

maximal  3  years  after  date  of  delivery, when 

mounting and starting has been carried out by an 

authorized D+H-distributor.

D+H guarantee is expired, with connection of D+H 

components with external systems or with mixing of 

D+H products with parts of other manufacturers.

Wiring:

Is the drive wired properly?

See connection plans.

Diagnostics with SCS software:

The SCS software and a BSY+ interface is 

required for further troubleshooting or 

configuration.

Troubleshooting

Minimum sash height/ -width

The details apply to a 

non-rotational installation of the drive!

(Window inwards opening)

Standard chain:

Minimum size (mm) = Stroke (mm) x 3.9

Maximum stroke bottom-hung vent: 1200 mm

Maximum stroke side-hung vent: 800 mm

Side bow chain:

Minimum size (mm) = Stroke (mm) x 1,6

Maximum stroke bottom-hung vent: 800 mm

Maximum stroke side-hung vent: 350 mm

x

x

Dimensions

939 mm

163 mm

= =

163 mm

= =

30 mm 

35 mm 

1265 

mm

Summary of Contents for CDC-TW-0502-0500-1-ACB

Page 1: ...CDC TW 0502 1 ACB instructions Please order bracket sets separately ...

Page 2: ...f pressure on window gasket after closing Direct connection of additional closing edge protection at the drive possible SKS option WARNING Read all safety warnings instructions illustrations and specifications provided with this product Failure to follow all instructions listed below may result in electric shock fire and or serious injury Save all warnings and instructions for future reference Obs...

Page 3: ... 30 S6 EN 60034 1 Aluminium powdercoated RAL 9006 IP 32 5 75 C 30 min 300 C 90 not condensing LpA 35 dB A Closing edge protection activated 3 repetitions of stroke Locking relief activated retraction lift max 0 2 mm Closing edge protection In the CLOSE direction the drive has an active protection for the main closing edge If there is an overload in the closing ranges C3 and C2 the drive runs OPEN ...

Page 4: ...n with perfect position directly from the control panel In this process all status messages such as the OPEN and CLOSED signals opening stroke and drive errors are transmitted to the control panel Functional description Wiring Is the drive wired properly See connection plans Diagnostics with SCS software The SCS software and a BSY interface is required for further troubleshooting or configuration ...

Page 5: ...22949Ammersbek Dirk Dingfelder Maik Schmees Member of the Board Authorized signatory Technical Director 21 02 2017 Maintenance and cleaning Maintenance work is only allowed when the device is in a de energized condition Inspection and maintenance has to be carried out according to D H maintenance notes Only original D H spare parts may be used RepairistobecarriedoutexclusivelybyD H Wipe away debri...

Page 6: ... WH 24 V DC 24 V DC 1 2 3 4 5 L 6 N 7 Z A E X a b LT Gruppe Mot a Mot b MOT BK BK OG 2x47kW En dm od ul Te rm ina l mo du le Mo du le ter mi na l EM 47 K WH BN OG YE GN GY Mot a Mot b ACB a HS BSY a BSY b ACB b CDC TW 0502 1 Junction box Monitoring SHEV fast running Normal mode ...

Page 7: ...itoring Cable according to D H table for layout of cables See instructions for use of control panel 1 2 3 4 5 L 6 N 7 Z A E X a b LT Group Mot a Mot b MOT BK BK OG 2x47kW En dm od ul Te rm ina l mo du le Mo du le ter mi na l EM 47 K WH BN OG YE GN GY Mot a Mot b ACB a HS BSY a BSY b ACB b CDC TW 0502 1 Junction box Monitoring Connection FRA 11 BSY VLD 51 BSY VP FRA 11 BSY VLD 51 BSY Mot a Mot b BS...

Page 8: ...a BN Mot b OG ACB a HS GY ACB b GN BSY b YE BSY a WH Mot a Option Opción SKS BN Mot b OG SKS GY SKS GN BSY b YE BSY a WH Mot a BN Mot b OG ACB a HS GY ACB b GN BSY b YE BSY a WH Mot a Connection PinAssignment Dyer Environmental Controls Ltd Unit 10 Lawnhurst Trading Estate Cheadle Heath Stockport SK3 0SD Tel 44 0 161 491 4840 E Mail enquiry dyerenvironmental co uk www dyerenvironmental co uk ...

Reviews: