background image

Minimum sash height/ -width

The details apply to a 

non-rotational installation of the drive!

(Window inwards opening)

Standard chain:

Minimum size (mm) = Stroke (mm) x 3.9

Maximum stroke bottom-hung vent: 1300 mm

Maximum stroke side-hung vent: 800 mm

Side bow chain:

Minimum size (mm) = Stroke (mm) x 1,6

Maximum stroke bottom-hung vent: 800 mm

Maximum stroke side-hung vent: 350 mm

x

x

99.826.94 1.2/02/17

CDC-0252-1-ACB

8/20

CDC-0252-1-ACB

 

English

- The drive set is fully configured ex factory.The 

drives must be reconfigured using SCS in the 

event of changes to the ex-factory configuration 

(e.g. when removing a drive from existing set or 

integrating a new drive).

- Mount the drives whilst under zero stress. With 

that, an even load distribution is provided by all 

the drive chains.

- At vertical active pulling application (e.g. for a 

skylight) the forces must be rearranged by 

software SCS.

- If after mounting, the distance X is greater than 23 

mm, null balance with software SCS is neccesary. 

Closure Ranges will shift in relation to new zero 

point.

Mounting information

≥ 23 mm ? 

X

ACB bus interface

ACB is used for secure communication between the 

drive  and  compatible  D+H  control  systems.  It 

enables  activation,  diagnostics  and  configuration 

with perfect position, directly from the control panel. 

In  this  process,  all  status  messages,  such  as  the 

OPEN  and  CLOSED  signals,  opening  stroke  and 

drive errors, are transmitted to the control panel.

BSY+ synchronised electronics:

A  synchronous  group  can  contain  up  to  8  drives, 

which communicate via bus. Each drive has its own 

address, configurable with SCS.

The last drive of a synchronous group is the master, 

which  controls  the  other  drives,  the  slaves. 

Differences in forces between the drives of a group 

are  balanced  by  means  of  intelligent  force  and 

position  control.  In  the  event  that  a  drive 

malfunctions, all the drives are automatically cut off.

Functional description

Electrical devices, accessories, batteries and packa-

ging  should  be  sorted  for  environmental-friendly 

recycling.  Do  not  dispose  electrical  devices  and 

batteries into household waste!

Only for EC countries:

According the European Guideline 2012/19/EU for 

waste  electrical  and  electronic  equipment  and  its 

implementation into national right, electrcal devices 

that are no longer usable must be collected separa-

tely and disposed of in an environmentally correct 

manner.

Disposal

Declaration of Conformity

We  declare  under  our  sole  responsibility  that  the 

product  described  under  “Technical  Data”  is  in 

conformity with the following directives:
2014/30/EU, 2014/35/EU
Technical file at:

D+H Mechatronic AG, D-22949 Ammersbek
Dirk Dingfelder 

Maik Schmees

Member of the Board 

Authorized signatory, Technical Director

11.08.2016

Maintenance and cleaning

Maintenance work is only allowed when the device is in 

a de-energized condition! Inspection and maintenance 

has to be carried out according to D+H maintenance 

notes.  Only  original  D+H  spare  parts  may  be  used. 

Repair is to be carried out exclusively by D+H.

Wipe away debris or contamination with a dry, soft 

cloth.

Do not use cleaning agents or solvents.

Guarantee

You will get 2 years guarantee for all D+H products 

from date of verified handing over of the system up to 

maximal  3  years  after  date  of  delivery,  when 

mounting and starting has been carried out by an 

authorized D+H-distributor.

D+H guarantee is expired, with connection of D+H 

components with external systems or with mixing of 

D+H products with parts of other manufacturers.

Visual inspection: 

Only one master drive is allowed.

The master always has the last address of all the 

drives; this can be found on a sticker attached to 

the drive. Slaves are numbered downwards from 

the master, so that in a group of three drives, for 

example, the master is no. 3, with a slave 2 and 

slave 1 drive. Please note that this only applies in 

the ex-factory configuration. As soon as the drives 

are reconfigured with SCS, the ex-factory 

addressing no longer applies.

Wiring:

Is the drive or drive group wired properly?

See connection plans.

Diagnostics with SCS software:

The SCS software and a BSY+ interface is 

required for further troubleshooting or 

configuration.

Troubleshooting

B

C

= =

405 mm

242 mm

163 mm

530 mm

485 mm

367 mm

322 mm

163 mm

163 mm

635 mm

472 mm

163 mm

CDC-0252-0350-1-ACB

CDC-0252-0600-1-ACB

CDC-0252-0500-1-ACB

CDC-0252-0800-1-ACB

A

B

C

30 mm 

35 mm 

A

Dimensions

Summary of Contents for CDC-0252-1-ACB Series

Page 1: ...CDC 0252 1 ACB instructions Standard version R Mirrored version option L Please order bracket sets separately ...

Page 2: ... reduced motor speed in ventilation mode SHEV high speed function fast running feature in case of an alarm Protection system for the main closing edge Rated voltage and Bus signals loopable for max 3 drives Connection possible from both sides The force can be increased at the factory up to 400 N nominal current 1 A in the seal area Relief of pressure on window gasket after closing Direct connectio...

Page 3: ...ng Ingress protection Temp range Fire stability Ambient humidity Emission sound pressure level Additional functions approx 1500 N 10 000 double strokes 30 S6 EN 60034 1 Aluminium powdercoated RAL 9006 IP 32 5 75 C 30 min 300 C 90 not condensing LpA 35 dB A Closing edge protection activated 3 repetitions of stroke Locking relief activated retraction lift max 0 2 mm Main closing edge Beside closing ...

Page 4: ...guration with perfect position directly from the control panel In this process all status messages such as the OPEN and CLOSED signals opening stroke and drive errors are transmitted to the control panel BSY synchronised electronics A synchronous group can contain up to 8 drives which communicate via bus Each drive has its own address configurable with SCS The last drive of a synchronous group is ...

Page 5: ...signatory Technical Director 11 08 2016 Maintenance and cleaning Maintenance work is only allowed when the device is in a de energized condition Inspection and maintenance has to be carried out according to D H maintenance notes Only original D H spare parts may be used RepairistobecarriedoutexclusivelybyD H Wipe away debris or contamination with a dry soft cloth Donotusecleaningagentsorsolvents G...

Page 6: ...Speed High Speed High Speed Mot a Mot b 1 2 3 4 5 L 6 N 7 Z A E X a b LT Group MOT BK BK OG 2x47kW End mod ul Term inal mod ule Mod ule term inal EM 47 K WH BN OG YE GN GY Mot a Mot b ACB a HS BSY a BSY b ACB b CDC 0252 1 Junction box Master 2 2 up to max 3 drives looped through WH BN OG YE GN GY Mot a Mot b ACB a HS BSY a BSY b ACB b CDC 0252 1 Slave 1 Mot b BN Mot a WH 24 V DC 24 V DC Monitoring...

Page 7: ...b BSY b ACB b ACB b CDC 0252 1 CDC 0252 1 Junction box Master 2 Slave 1 High Speed High Speed High Speed WH white BN brown OG orange YE yellow GN green PK pink GY grey Monitoring Not in case of GVL E K M Protect wire against short circuit In case of connection to D H SHEV control panels with E HS line monitoring Cable according to D H table for layout of cables See instructions for use of control ...

Page 8: ...tion SKS BN Mot b OG SKS GY SKS GN BSY b YE BSY a WH Mot a BN Mot b OG ACB a HS GY ACB b GN BSY b YE BSY a WH Mot a Motor side Chain side Type plate WH white BN brown OG orange YE yellow GN green PK pink GY grey Dyer Environmental Controls Ltd Unit 10 Lawnhurst Trading Estate Cheadle Heath Stockport SK3 0SD Tel 44 0 161 491 4840 E Mail enquiry dyerenvironmental co uk www dyerenvironmental co uk ...

Reviews: