background image

 

There are parts made from fiberglass in this kit. Take normal precautions when handling any fiberglass material. 
There may be fiberglass dust, slivers or particles present when the fiberglass parts were manufactured. The use of 
typical fiberglass handling safety gear (gloves, dust mask, eye shield, clothing, etc.) when handling and working 
with fiberglass is recommended. Use a damp rag to wipe the parts. 

Do not

 use compressed air to clean fiberglass 

parts. Measures can be taken to reduce exposure after a person has come in contact with fiberglass. Eyes should 
be flushed with water and any area of exposed skin should be washed with soap and warm water to remove 
fibers. Clothing worn while working with fiberglass should be removed and washed separately from other 
clothing. The washing machine should be rinsed thoroughly after the exposed clothing has been washed. Check 
with your local or state safety and/or environmental agencies for more detailed precautions. 

 

 

Center Post Assembly: 

 
Assemble the one 1-1/4" OD x 58" long 
fiberglass center post into the one 1-3/8" x 14" 
long aluminum tube, slit end oriented toward 
the middle of the center post. With the un-slit 
end of the aluminum tube aligned flush with 
the end of the fiberglass center post, secure 
them together with the 

DXE-ECL-16SS

 

Element Clamp, over the slits, at 3/8" spacing 
between the end of the slit end of the tube to 
the element clamp as shown below. 
 

 

 

 

 

 

 

 

 

 

Center Post Assembly 

Spreader Assembly 

 
Place one 

DXE-ECL-1000

 on each slit end of the six 1" OD sections. Slide the 3/4" OD x 43" long sections 

into the 1" sections approximately 3 to 4" and clamp them together. Ensure the slit ends are horizontally 
aligned, not vertical. Position the element clamp 
about 1/4" to 3/8" away from the end of the 
section when tightening. The clamp tightening 
screw should be on the bottom of the tube 
assembly. 
 
Place one 

DXE-ECL-0875

 on each slit end of 

the six 3/4" OD sections. Slide the 1/2" OD x 48" 
long sections into the 3/4" OD sections 
approximately 3 to 4" and clamp them together 
as shown below. Position the element clamp 
about 1/4" to 3/8" away from the end of the section when tightening. The clamp tightening screw should be 
on the bottom of the tube assembly. 
 
The six 3/4" x 5" long tubes are provided if you want to re-enforce the 1" OD sections when mounted to a 
base or hub assembly. Refer to the 

DXE-HEXX-5TAP-2

 Hexxagonal Beam 5-Band total package 

instructions for details. 
 
 
 
 
 

 
                                                              Spreader Assembly 

Reviews: