1. Check the phase and neutral ends of the network.
2. Attach an appropriate diameter insulated ferrule to 

the ends of the electrical wires.

3. Remove the plugs at the top of the unions.
4. Unscrew the junction box and remove the box.

                 Figure 6.8: Removing the junction box

5. Transmit the ends of the cable through the number 
    1 gland shown in the figure. 
6. Make the electrical connection of the transmitted 

cable to the socket named “A” in Figure 6.9 as shown 
in Figure 6.7.

7. Tighten the glands so that there is no excessive cable 

tension at the connection point. 

8. Reinstall the junction box.

          

Figure 6.8: Removing the junction box

It is recommended to use a residual current relay to 
protect the user and the pump. Whichever type of 
pump is to be used, it must be selected according to 
the nominal current and voltage of that pump, and a 
B type relay (which can open at DC current and high 
frequency). (Grounding current should be below 3.5 
mA according to EN 60335 standard.)).

7. DISPLAY AND SETTINGS

  

  The OPUS display consists of nine LEDs and three 

       control keys. See. Figure 7.1.

The control screen provides information about the 
pump status and allows the desired operating mode 
to be set. Indicators and keys on the control screen are 
as given below:

               

               1.  Automatic Variable Pressure Operating Mode

            2.  Automatic Constant Pressure 

                 Operating Mode

             3. Manual Operating Mode 

             4. Night Operating Mode

              5. Power Drawn

              6. Target Pump Head

              7.  Motor Output Voltage 

              8. Target Speed 

              9. For Program Selections and Settings

             10. Minus Key To Decrease

               11. Plus Key To Increase

 

The electrical cable of the pump must not 

come into contact with the pump or the 

plumbing.

Mains voltage values must be within the 

values in Table 5.1.

Summary of Contents for OPUS 0-12 280 V

Page 1: ...SERIES INSTALLATION OPERATION MAINTENANCE AND REPAIR MANUAL OPUS...

Page 2: ...2 OPUS SERIES INSTALLATION OPERATION MAINTENANCE AND REPAIR MANUAL www duyarpompa com...

Page 3: ...ng and Air Drain 8 6 4 Cable Fuse Selection and Electrical Installation 8 7 DISPLAY AND SETTINGS 10 7 1 Operating Modes 11 7 1 1 Manual Operating Mode 11 7 1 2 Constant Pressure Operating Mode 11 7 1...

Page 4: ...should be as in Table 3 2 3 4 Operating Conditions OPUS circulation pumps have been developed for the circulation and pressurization of the water circulating in the heating and air conditioning system...

Page 5: ...code Tracking Number 7 Input Voltage Voltage 8 Minimum Power 9 Minimum Current 10 Temperature Class 11 Input Frequency 12 Maximum Power 13 Maximum Current 14 Serial number 15 QR Code 16 Year of produc...

Page 6: ...installation pressure should be between the values in Table 5 1 and Table 5 3 The pump must be operated for a while to drain the air from the installation 6 4 Cable Fuse Selection and Electrical Inst...

Page 7: ...ichever type of pump is to be used it must be selected according to the nominal current and voltage of that pump and a B type relay which can open at DC current and high frequency Grounding current sh...

Page 8: ...conds to set the target speed in night work When the P7 option is reached with the button when the target speed is reached with the keys by pressing the P button again the speed record is made by keep...

Page 9: ...ng remains constant The Hsetting value of the pumps selected in accordance with the operating point is determined as follows The H value at the operating point is marked on the constant pressure opera...

Page 10: ...selected on the screen in 0 5 meter increments 9 4 Operating Mode Selection Criteria The operating mode is selected by considering the criteria in the table below Table 9 1 Operating Mode Selection Cr...

Page 11: ...INSTALLATION OPERATION MAINTENANCE AND REPAIR MANUAL 9 10 TERMINAL CONNECTION DETAIL 10 1 Terminal Connection Detail Table 230 VAC DIN1 Communications BSM RS485 Relay Link DIN2 communication devices...

Page 12: ...will start stop from digital 1 and from the buttons on it in Manual mode P17 DN2 selection 0 Dysfunctional device It works according to its own setting 1 The device will start from digital 1 in mode s...

Page 13: ...tor do notr otate at synchronous speedd ue to the instantaneousc hange in load Checkt he suitabilityo ft he installation water flow direction with the arrowm arko nt he pump body W aitf or thep umpt o...

Page 14: ...2 180 50 182 232 300 8 80 OPUS D 32 12 180 2 180 50 182 232 300 8 80 PUMP TYPE D1 D2 D3 D4 D5 nx m mm L1 H1 H2 H3 H4 Weight PN6 PN10 PN6 PN10 OPUS 40 10 220 C 150 100 110 90 44 130 4x14 4x18 220 65 1...

Page 15: ...e will be filled by the authorized DUYAR POMPA dealer from where the device was purchased and sent to DUYAR POMPA and a copy will be given to the user During the warranty period the warranty certifica...

Page 16: ...equest is not fulfilled the seller the manufacturer and the importer are jointly and severally liable 6 The repair period of the goods cannot exceed 20 working days This period starts from the date of...

Page 17: ...STAINLESS BOOSTER FIRE BOOSTER DNP HORIZONTAL END SUCTION PUMP SINGLE STAGE END SUCTION CLOSED WHEEL ELECTRIC OR DIESEL ENGINE AXIAL TYPE PUMP MoreDetails...

Page 18: ...2021 11 1 WE ARE SENSIBLE TO LIVE...

Reviews: