Dux ReadyHot series Installation Manual Download Page 5

5

Dux Readyhot 11.007 V2 - 28/9/11

VALVES (Fig. 3)

Approved isolation and non return valves must be fitted to the cold water inlet. 

A combination isolating and non return valve may be used. Approved pressure limiting and expansion control

valves must also be fitted. A combination pressure limiting and expansion control valve may be used. The
pressure limiting valve must be rated at 500 kPa. 

The Expansion Control valve must be rated at 700 kPa. 

OTHER RATING COMBINATIONS ARE NOT

SUITABLE!

Valves must not be connected directly to the Readyhot module or Dux Endurance water heater.

It may be necessary to fit a temperature limiting device for delivery to areas used primarily for the purposes of

personal hygiene. Refer to the ‘Heated Water Delivery Temperature’ section of this document. 

PIPEWORK (Fig. 3)

All hot water pipework should be insulated to optimise performance and minimise energy wastage. This may

also be required by local regulations. 

The flow section of the pipework should be 20mm (¾") type B copper or equivalent. The return section of the

pipework should be 20mm (¾") type B copper or equivalent. Total combined length of the flow and return pipe
should not exceed 60 meters. 

The branch lines from the flow and return pipework to the hot water outlets should be sized in accordance with 

AS/NZS 3500.

MOUNTING THE READYHOT MODULE (Fig. 3)

The Readyhot module is usually located below the Dux Endurance water heater. However, it can be mounted
anywhere within a 1.5 metre distance from the water heater. These instructions assume it is located below the
water heater.

1. Draw a line vertically down from the cold water inlet connection of the Dux Endurance water heater.

2. Mount the Readyhot module so the top edge of the enclosure is approximately 300 mm below the Dux

Endurance water heater with the water outlet connection of the Readyhot module in line with the water inlet
connection of the Dux Endurance water heater as shown in (Fig. 3).

3. Fasten the Readyhot module to the wall or supporting structure. The top bracket has a keyhole slot so that the

Readyhot module can be positioned by hanging it on one screw, then the other screws can be secured. 

4. Connect a piece of 20mm (¾") type B copper or equivalent between the outlet of the Readyhot module and

the cold water inlet of the Dux Endurance water heater. 

5. Connect the isolating, non return, pressure limiting and expansion control valves and an adequately sized cold

water supply pipe to the cold water inlet of the Readyhot module. 

6. Plan the route of the 'flow and return' pipework to ensure the shortest distance between the pipework and the

hot water outlets. 

7. Connect the 'flow and return' pipework between the hot water outlet of the Dux Endurance water heater and

the heating loop return connection on the Readyhot module. Insulate pipework. The 'return' section of the
pipework should be connected after the branch line furthest away from the water heater. 

8. Install branch lines from the pipework to hot water outlets.    

COMMUNICATION CABLE

Electronic signals are communicated between the Readyhot module and the Dux Endurance water heater via

the communications cable already connected to the Readyhot module. 

The communications cable is connected to the remote control connection terminals on the Dux Endurance

water heater in the same way as cables from the remote controller(s). Refer to the ‘WATER CONTROLLERS’
section of the ‘Operation / Installation Manual’ supplied with the Dux Endurance water heater for details. 

Do not remove the front cover of the Readyhot or the water heater unless the power supply is
isolated. It is not necessary to remove the front cover of either appliances for the purposes of
mounting the Readyhot module.

Install temperature limiting device in accordance with the ‘Heated Water Delivery Temperature’
section of this document.

WARNING

WARNING

Summary of Contents for ReadyHot series

Page 1: ...t AS NZS 3000 AS NZS 3500 AS NZS 5601 Local Regulations and Municipal Building Codes including local OH S requirements This appliance must be installed maintained and removed by an Authorised Person F...

Page 2: ...witch is available from electrical wholesalers The installation of the water heater and water controllers must be performed in accordance with the Operation Installation manual supplied with the water...

Page 3: ...Preheated water will be delivered from the flow and return heating loop to the outlet LOCATION Fig 3 Location and clearance requirements for the Dux water heaters are detailed in the Installation Ins...

Page 4: ...ection R 15mm 10 Insulated heating loop Flow pipework R 20mm 11 Insulated heating loop Return pipework R 20mm 12 Pump bleed valve 13 Cold water inlet bleed valve 14 Readyhot water heater communication...

Page 5: ...nection of the Readyhot module in line with the water inlet connection of the Dux Endurance water heater as shown in Fig 3 3 Fasten the Readyhot module to the wall or supporting structure The top brac...

Page 6: ...nstructions supplied with the Dux Endurance water heater and the Instruction sheet supplied with the Dux water controller Other types of Dux water controllers can be fitted but will not enable activat...

Page 7: ...e case If the left LED on the Readyhot PCB does not glow green the pump has not started In this case there is probably an incorrect or missing wiring connection between water controllers or manual act...

Page 8: ...n for Switch Harness manual activation switch TRANSFORMER BLEED COLD WATER INLET BLEED VALVE Head Office Lackey Road Moss Vale NSW 2577 AUSTRALIA Tel 1300 365 115 Australia Tel 0800 729 389 New Zealan...

Reviews: