Step 8

•  This unit has a preset temperature of 

50°C.

•  If controllers are installed, the 

maximum temperature setting will 
still be 50°C. 

Step 9

•  Make sure there is water inside the 

unit prior to turning on the power. 
This can be achieved by turning on 
the tap.

Step 10

•  If the water heater has been installed 

correctly, when the power is turned 
on the heater will go through 
initialisation. This will take a few 
seconds.

•  If a fault occurs, please refer to the 

Owner’s Manual

.

•  The gas valve must be checked for 

gas pressure during operation. 

•  The test point pressure should be 

set in accordance with the pressure 
rating marked on the data plate label, 
located on the side of the heater.

•  Commission appliance and check 

safe and correct operation of the 
appliance.

Summary of Contents for 26XL

Page 1: ...orian PIC Requirements Installer s Guide For advice repairs and service call 1300 365 115 Australia 0800 729 389 New Zealand Important INFORMATION Read This Document First On completion sign and leave...

Page 2: ...e the risks can t be controlled Step 2 The existing water heater if applicable should be drained and removed in a responsible manner Note Do not drain on to grass or garden beds Step 3 This heater is...

Page 3: ...re Limiting Valve may be required b gas supply pressure requirements minimums 1 13kPa for Natural Gas 2 75kPa for LPG c gas type is the unit set up for the gas supplied to the property Ensure that the...

Page 4: ...e use of new valves for all Installation Please refer plumbing code and or local requirements A Gate Valve or Ball Valve must be used on the cold water inlet to the water heater This requirement is an...

Page 5: ...ill require a regulator of 4kg per hour capacity Before connecting the appliance to the gas service purge any debris or air from the gas service Venting of purged gas shall be an area free of sources...

Page 6: ...on the tap Step 10 If the water heater has been installed correctly when the power is turned on the heater will go through initialisation This will take a few seconds If a fault occurs please refer to...

Page 7: ...conduit Then pass the cables through the hole of the fitting bracket and pull them out Attach the fitting bracket with screws adjusting the screw hole to the wiring box Connect the remote controller c...

Page 8: ...remote controller and fix the remote controller to the wall with wood screws 2 pcs in the screw holes provided You can detach the covers with catching the bottom corner s slot with nail Do not tighten...

Page 9: ...in the Dux Hot Water Owner s Manual supplied with the solar water heater Upon completion of installation this document should be given to the home owner in its entirety When required by Dux Hot Water...

Page 10: ...Installer s Guide Endurance six 10 Part No IG090701 Version B...

Page 11: ...Installer s Guide Endurance six 11 Part No IG090701 Version B...

Page 12: ...Installer s Guide Endurance six Part No IG090701 Version B For advice repairs and service call 1300 365 115 Australia 0800 729 389 New Zealand Gas continuous flow water heater Models 26XL 26XN...

Page 13: ...ter outlet Valve 1 Valve 2 Outlet to deliver hot water to sanitary fixtures Hot water outlet Pipe size 20mm L COMMISSIONING THE WATER HEATER 1 After completion of the water heater installation the fol...

Page 14: ...y to the fixtures in the property a minimum of Four 4 Metres of pipework must be used between the outlet of the Dux En durance water heater and the first tap and outlet See Diagram below 1 2 The Hot w...

Reviews: