The hot water supply pipework is required to be insulated with Ensolex or similar  

insulation from the hot water heater to all outlet points within the building.

INSTRUCTIONS FOR UNITS SUPPLIED SET AT 50℃ TO  
COMPLY WITH AS 3498-2009. 

 
PLEASE NOTE THIS 50℃ UNIT IS NOT TO BE USED IN 
CONJUNCTION WITH SOLAR WATER HEATERS. 

 

1) This water heater is to be installed to comply with AS/NZS 3500.4 and AS5601 
    codes and any local by laws or regulations. 
2) Please refer to the Installation / Operating instructions supplied with this water 
    heater for details of the installation procedure. 
3) When installing the water heater hot water pipework please refer to the following 
    pipework installation requirements (Diagram 1) to comply with the AS3498-2009 
    code. The first outlet valve (tap) should be a minimum of Four (4) metres from  
    the water heater outlet.

Valve 1.

Valve 2.

Outlet to deliver hot  
water to sanitary  
fixtures

Hot water outlet 
 

Pipe size 20mm

L

COMMISSIONING THE WATER HEATER. 
1) After completion of the water heater installation the following commissioning 
    procedure is to be implemented. 
   a) Before turning on the water heater power supply and gas supply, purge all  
       air from the Hot water supply pipework. 
   b) Turn on the power, allow 30 seconds for the water heater to check safety 
       functions. Turn on the gas supply. 
   c) Turn on Valve 1. to a minimum flow rate (approximately 3 l/m) and allow 
       the water heater to operate for approximately Two(2) minutes and check the  
       flowing water temperature using a digital thermometer. 
   d) Repeat above procedure (c) at the maximum possible flow rate. 
   e) The water temperature will be delivered at 48-50℃ continuously. 
    f ) If the water heater does not deliver water at this temperature contact you  
       supplier or DUX Hot Water on 1300 365 115 for advice. 
 
                                       PLEASE SEE REVERSE SIDE.

Diagram 1.

Minimum of distance of pipework  
L to Valve 1 is Four (4) metres.

Summary of Contents for 26XL

Page 1: ...orian PIC Requirements Installer s Guide For advice repairs and service call 1300 365 115 Australia 0800 729 389 New Zealand Important INFORMATION Read This Document First On completion sign and leave...

Page 2: ...e the risks can t be controlled Step 2 The existing water heater if applicable should be drained and removed in a responsible manner Note Do not drain on to grass or garden beds Step 3 This heater is...

Page 3: ...re Limiting Valve may be required b gas supply pressure requirements minimums 1 13kPa for Natural Gas 2 75kPa for LPG c gas type is the unit set up for the gas supplied to the property Ensure that the...

Page 4: ...e use of new valves for all Installation Please refer plumbing code and or local requirements A Gate Valve or Ball Valve must be used on the cold water inlet to the water heater This requirement is an...

Page 5: ...ill require a regulator of 4kg per hour capacity Before connecting the appliance to the gas service purge any debris or air from the gas service Venting of purged gas shall be an area free of sources...

Page 6: ...on the tap Step 10 If the water heater has been installed correctly when the power is turned on the heater will go through initialisation This will take a few seconds If a fault occurs please refer to...

Page 7: ...conduit Then pass the cables through the hole of the fitting bracket and pull them out Attach the fitting bracket with screws adjusting the screw hole to the wiring box Connect the remote controller c...

Page 8: ...remote controller and fix the remote controller to the wall with wood screws 2 pcs in the screw holes provided You can detach the covers with catching the bottom corner s slot with nail Do not tighten...

Page 9: ...in the Dux Hot Water Owner s Manual supplied with the solar water heater Upon completion of installation this document should be given to the home owner in its entirety When required by Dux Hot Water...

Page 10: ...Installer s Guide Endurance six 10 Part No IG090701 Version B...

Page 11: ...Installer s Guide Endurance six 11 Part No IG090701 Version B...

Page 12: ...Installer s Guide Endurance six Part No IG090701 Version B For advice repairs and service call 1300 365 115 Australia 0800 729 389 New Zealand Gas continuous flow water heater Models 26XL 26XN...

Page 13: ...ter outlet Valve 1 Valve 2 Outlet to deliver hot water to sanitary fixtures Hot water outlet Pipe size 20mm L COMMISSIONING THE WATER HEATER 1 After completion of the water heater installation the fol...

Page 14: ...y to the fixtures in the property a minimum of Four 4 Metres of pipework must be used between the outlet of the Dux En durance water heater and the first tap and outlet See Diagram below 1 2 The Hot w...

Reviews: