4
Dutchwest
30003847
Installation
SAFETY NOTICE: IF YOUR DUTCHWEST CON-
VECTION HEATER IS NOT PROPERLY INSTALLED,
OPERATED AND MAINTAINED, A HOUSE FIRE MAY
RESULT. FOR SAFETY, FOLLOW ALL INSTALLA-
TION, OPERATION AND MAINTENANCE DIREC-
TIONS. CONTACT LOCAL BUILDING OFFICIALS
ABOUT RESTRICTIONS AND INSTALLATION
INSPECTION REQUIREMENTS IN YOUR AREA.
Before you begin the installation, review your plans to
confirm that:
•
Your stove and chimney connector will be far enough
from combustible material to meet all clearance
requirements.
•
The floor protector is large enough and is construct-
ed properly to meet all requirements.
•
You have obtained all necessary permits from local
authorities.
Your local building official is the final authority for ap-
proving your installation as safe and for determining
that it meets local and state codes.
Clearance and installation information is printed on the
metal label attached to the rear of the stove. Local au-
thorities generally will accept the label as evidence that,
when the stove is installed according to the information
on the label and in this manual, the installation meets
codes and can be approved.
Codes vary in different countries, however. Before
starting the installation, review your plans with the local
building authority. Your local dealer can provide any
additional information needed.
Important:
Failure to follow these installation
instructions may result in a dangerous situation, in-
cluding a chimney or house fire. Follow all instruc-
tions exactly, and do not allow makeshift compro-
mises to endanger property and personal safety
.
All local regulations, including those referring to
national and European standards need to be com-
plied with when installing this stove.
Chimney Types
Your Dutchwest Convection Heater must be connected
to a sound masonry chimney that meets local codes, a
relined masonry chimney that meets local codes, or to
an approved prefabricated metal chimney. Whatever
kind you use, the chimney and chimney connector must
be in good condition and kept clean.
Masonry Chimneys
If you use an existing masonry chimney, it must be
inspected to ensure safe condition before the stove
is installed. Your local professional chimney sweep,
building inspector, or fire department official will be able
either to make the inspection or to direct you to some-
one who can.
The flue and chimney design must meet requirement
J2, Part J of the building regulations 2000 (Combustion
Appliances and Fuel Storage Systems).
An inspection of the chimney must confirm that it has
a lining. Do not use an unlined chimney. The chimney
should also be examined for cracks, loose mortar, other
signs of deterioration, and blockage. Repair any de-
fects before the chimney is used with your stove.
Unused openings in an existing masonry chimney must
be sealed with masonry to the thickness of the chimney
wall, and the chimney liner should be repaired. Open-
ings sealed with pie plates or wallpaper are a hazard
and should be sealed with mortar or refractory cement.
In the event of a chimney fire, flames and smoke may
be forced out of these unused thimbles.
The chimney should be thoroughly cleaned before use.
A newly-built masonry chimney must conform to the
standards of your local building code or, in the absence
of a local code, to a recognized national code. Masonry
chimneys must be lined, either with code-approved
masonry or pre-cast refractory tiles, stainless steel
pipe, or a code-approved, “poured-in-place” liner. The
chimney’s clean-out door must seal tightly.
ST241
chimney types
12/13/99 djt
Prefabricated Double-Wall
Insulated Chimney
Tile Lined
Masonry
Chimney
ST241
Fig. 2
If in sound condition and approved for use, either a
masonry or a prefabricated chimney may be used.
Summary of Contents for 2460CE
Page 28: ...28 Dutchwest 30003847...
Page 29: ...29 Dutchwest 30003847...
Page 30: ...30 Dutchwest 30003847...
Page 32: ...MHSC 149 Cleveland Drive Paris Kentucky 40361 www mhsc com...