background image

DC Box - 8

Part No 9089-B

 

System Description

The DC Box is constructed as a fume-cupboard 
with a door for the input and output of equipment. 
The DC Box is equiped with ventilation, source 
extraction, lighting and compressed air. A disposal 
sack for the heavy dust and old 

fi

 lters is mounted 

on the bottom of the DC Box.

When pulling heavy machines in and out of the 
DC Box a trolley can be used.

Operating

Cleaning of equipment:

-   Put the equipment in a room intended for 

contaminated machines (near the DC Box).

-   On a dust extraction; 

fi

 rst remove the hose 

and other accessories. Put some tape on the 
openings of the hose. After that clean them in 
the DC Box.

-   Put the dust extraction on the trolley.

-   Check that the DC Box power control is on.

-   Start the DC Box ventilation.

-   Open the door of the DC Box and put the 

trolley inside.

-   Close the door.

-   Remove the plastic bag on the dust extraction 

and put it into the disposal sack of the 
DC Box. 

-   Remove the 

fi

 lter of the dust extraction.

-   Turn off the ventilation, and use the dust 

extraction to clean the 

fi

 lter.

-   Turn on the ventilation.

The three openings on the front side are intended 
for the operator to use when cleaning equipment. 
Two of them are for the operator’s hands and one 
of them is to be used as an air inlet.

The cleaning of equipment is done with different 
suction tools, compressed air and brushes.

-   Clean the rest of the dust extraction with the 

DC Box air pressure tool.

-   Turn off the ventilation and use the dust 

extraction to clean the the DC Box (including 
the trolley).

-   Turn on the ventilation.

-   After 3 minutes; open the door.

-   Remove the dust extraction.

-   If nessecary, clean the dust extraction trolley 

separately as above.

-   After cleaning, close the door of the DC Box, 

turn of the ventilation and the lighting.

Emptying the disposal sack:

-   When the disposal bag is full, tighten and seal 

it. Turn on the ventilation in the DC Box before 
removing the sack. Put a new sack into the 
DC Box.

Summary of Contents for DC Box

Page 1: ...DC Box Bruksanvisning i original Original instructions VARNING L s bruksanvisningen f re anv ndning av utrustningen WARNING Read the instruction manual before using the equipment Part No 9089 B...

Page 2: ...cations without notice and is under no obligation to alter previously delivered products Dustcontrol is not responsible for errors or omissions in this user instruction Tillverkare Manufactured by Dus...

Page 3: ...r___________________ 6 Garanti____________________ 6 EG f rs kran ______________ 10 Dustcontrol Worldwide_______ 11 SVENSKA Contents Safety Considerations ________ 7 Technical Data______________ 7 Sy...

Page 4: ...alltid vara st ngda vid reng ringsarbete i DC Boxen Ha alltid allm nventilationen i DC Boxen p i minst 3 minuter efter avslutad reng ring innan gavel lucka ppnas H x B x L 1750 x 800 x 1300 mm H x B x...

Page 5: ...stoftavskiljaren p kvagnen och lossa l tt p stoftavskiljarens skruvar om dessa sit ter h rt Kontrollera att DC boxens huvudstr mbrytare r p slagen T nd belysningen i DC boxen Starta DC boxens allm nve...

Page 6: ...Tillbeh r Ben mning Art nr 50 st Plasts ck standard 4714 Garantitiden r tv r vid 1 skift eller motsvarande tid vid fler skift Garantin avser fabrikationsfel Duscontrol tar inte ansvar f r maskiner utr...

Page 7: ...be closed Always keep the ventilation on for at least 3 minutes after the cleaning is finished before opening the door 3 Personal Protection Always use protection gloves and an overall Be sure to keep...

Page 8: ...dust extraction and put it into the disposal sack of the DC Box Remove the filter of the dust extraction Turn off the ventilation and use the dust extraction to clean the filter Turn on the ventilatio...

Page 9: ...Service The warranty period is for one full year of single shift operation or equivalent in multishift operation The warranty covers manufacturing defects This warranty is null and void for machines e...

Page 10: ...g Peter S derling CEO Technical Manager EG declaration of conformity We declare that DC Box is in conformity with following directives and standards 2006 42 EC 2014 35 EC 2014 30 EC EN 60204 1 Serial...

Page 11: ...70 32 97 56 0 info dustcontrol de www dustcontrol de DK Erenfred Pedersen A S Construction Tel 45 98 13 77 22 info ep dk www ep dk DK Dansk Procesventilation ApS Industry Tel 45 61 270 870 info dansk...

Reviews: