zhen
Position of water connection
80mm
3⅛"
200mm
7⅞"
305mm
12"
IG 1/2"
Pre-installation
>
Install the water connection and water outlet in the
specified areas.
WARNING
Health risk and potential product
damage!
>
Supply the integrated shower toilet with tab water
from the main water system.
>
Do not connect any waste water, grey water, industrial
water, sea water or other untreated or semi-treated
water.
NOTICE
Risk of product damage due to hard
water.
>
Install a water softener with water hardness
≥ 2.4 mmol/l (≥ 240 ppm).
2
Positioning the mounting template
>
Position the mounting template.
>
Ensure that the position of the drainage hole,
the inlet water supply pipe hole correspond to the
dimensional drawing and the mounting template.
>
Ensure that the line designating the center of the
mounting template is the same line designating
the center of the drainage hole.
16
Preparing the inlet hose adaptor
>
Put watertight material around one end of the
inlet hose adaptor.
26
Connecting water
NOTICE
Avoiding any malfunctions!
>
The new hose-sets supplied with the appliance
are to be used and old hose-sets should not be
reused.
31
Opening the stop valve
>
Open the main water supply.
>
Open the stop valve.
>
Flush the water supply hose and collect water.
>
Close the main water supply.
35
Checking for leaks
>
Open the water supply.
>
Check if there is any water leakage.
>
Close the water supply.
Cold water
DN 15(½" NPS)
Water pressure
0.07 – 0.75 MPa
(10 – 109 psi)
Water hardness
max. 2.4 mmol/l
(240 ppm)
57242_Mounting_SensoWash i Plus_US/19.07.1
7