TUF LOCKER WALL CLADDING 

903mm 

392mm 

D008 

CLADDING DETAIL 

Birds Eye View 

fig. 1 

fig. 2 

To Avoid Corrosion: 

Where at all possible try not to trap metal filings between two sheets. Remove all metal filings before riveting. 

Carbon in pencils reacts with the Zinc/Aluminium coating on steel. Use ink to mark steel. 

Step 1:

 Door  Jambs:  Position  left  hand  Door  Jamb  Flashing  at 

correct  measurement  from  left 

(cladding  detail)

  and  nail 

flush with top of Top Plate using a 30mm clout. Do not fit 
50mm  nails  at  this  stage.  Pre-drill  holes  to  make  nailing 
easier 

(fig. 1)

 

 

Position Door Jamb Flashing and nail at the bottom. Posi-
tion  right  hand  Door  Jamb  Flashing  903mm  from  left 
hand  Door  Jamb  Flashing 

(cladding  detail)

  and  nail  in 

place. 

 

FRONT VIEW 

DOOR JAMB 
FLASHING 

Summary of Contents for TUF LOCKER

Page 1: ...Quality Made Affordable ASSEMBLY INSTRUCTIONS TUF LOCKER BASE SIZE 1810mm x 685mm...

Page 2: ...checklist If you are making your own floor refer to Raised Base Plate section now Do not attempt to build your shed in high winds Beware of sharp edges Protect your eyes and ears Use electric tools w...

Page 3: ...ASE PLATES ROOF SIZE 1 845 x 0 820 End Wall Nogs Front Left Nog Front Right Nog Back Wall Nog Yellow 45 x 45 H1 Roof Sheet Or Door DESCRIPTION Clear Roof Panel Folded Roof Sheets Corner Wall Sheets 3...

Page 4: ...to Green and Red joins to Red See fig 2 for nailing detail on Top Back Plate 70x45mm Step 3 Position remaining End Frame on top of plates While someone sup ports frame nail in place using two 75mm na...

Page 5: ...ing on steel Use ink to mark steel Step 1 Door Jambs Position left hand Door Jamb Flashing at correct measurement from left cladding detail and nail flush with top of Top Plate using a 30mm clout Do n...

Page 6: ...heets at the back are positioned 47mm down from top of Top Plate Step 5 Drill a hole through Door Jamb Flashings and Wall Sheets top and bottom Nail with 50mm nails fig 1 Nail left hand Door Jamb Flas...

Page 7: ...nsure it OVERLAPS Roof Sheets Rivet sheet joins one rivet 200mm from edge front and back When riveting Clear Panel to Roof Sheets use sealed rivet with steel washer fig 2 Step 3 Line up ribs on the ro...

Page 8: ...f Flashing and fit one rivet to top hinge While still holding in position fit one rivet to bottom hinge Step 3 Close door and check it fits correctly If not drill out rivets and make necessary adjustm...

Page 9: ...RITY DOOR Optional Step 1 Place shed in final position Check diagonal meas urements are equal and shed is level before fitting door Step 2 Hold Door in position approximately 5mm down from Top Plate F...

Page 10: ...all Sheets will then protrude 20mm below the Base Plate This will stop water flowing in between the Base Plate and Floor If you choose this option the Floor should be made 15mm smaller than Base Size...

Page 11: ...in most environments The surface must be dry and free of dirt oil grease and other contaminants prior to painting but no weathering of the surface is required Zinc rich primers are recommended for us...

Page 12: ...nd very severe environmental situations or in any area where the mild steel corrosion rate as published by BRANZ exceeds 200g m2 3 Minimum maintenance must be carried out in accordance with instructio...