background image

TUF LOCKER FLOOR (Optional) 

PURPOSE BUILT FLOOR 

Step 1:

 Select  the  two  Floor  Boards  which  have 

checked  out  corners.  Position  at  front  and 
back of the shed so they fit around Studs. 

For  sheds  being  placed  on  a  purpose  built  floor,  we 
recommend  that  the  studs  are  shortened  by  30mm. 
The Wall  Sheets  will  then  protrude  20mm  below  the 
Base  Plate.  This  will  stop  water  flowing  in  between 
the Base Plate and Floor. 
 
If  you  choose  this  option,  the  Floor  should  be  made 
15mm smaller than Base Size. 
 

Note:

  Although  it  is  not  essential,  fitting  Damp 

Proof Course in between the Base Plate and 
the  Floor  will  give  added  protection  against 
moisture. 

i.e. CONCRETE / PLYWOOD 

Step 2:

 Lay  out  remaining  Floor  Boards.  Nail  in 

each  Floor  Board,  two  50mm  nails  each 
end and two into each Floor Joist.  

Summary of Contents for TUF LOCKER

Page 1: ...Quality Made Affordable ASSEMBLY INSTRUCTIONS TUF LOCKER BASE SIZE 1810mm x 685mm...

Page 2: ...checklist If you are making your own floor refer to Raised Base Plate section now Do not attempt to build your shed in high winds Beware of sharp edges Protect your eyes and ears Use electric tools w...

Page 3: ...ASE PLATES ROOF SIZE 1 845 x 0 820 End Wall Nogs Front Left Nog Front Right Nog Back Wall Nog Yellow 45 x 45 H1 Roof Sheet Or Door DESCRIPTION Clear Roof Panel Folded Roof Sheets Corner Wall Sheets 3...

Page 4: ...to Green and Red joins to Red See fig 2 for nailing detail on Top Back Plate 70x45mm Step 3 Position remaining End Frame on top of plates While someone sup ports frame nail in place using two 75mm na...

Page 5: ...ing on steel Use ink to mark steel Step 1 Door Jambs Position left hand Door Jamb Flashing at correct measurement from left cladding detail and nail flush with top of Top Plate using a 30mm clout Do n...

Page 6: ...heets at the back are positioned 47mm down from top of Top Plate Step 5 Drill a hole through Door Jamb Flashings and Wall Sheets top and bottom Nail with 50mm nails fig 1 Nail left hand Door Jamb Flas...

Page 7: ...nsure it OVERLAPS Roof Sheets Rivet sheet joins one rivet 200mm from edge front and back When riveting Clear Panel to Roof Sheets use sealed rivet with steel washer fig 2 Step 3 Line up ribs on the ro...

Page 8: ...f Flashing and fit one rivet to top hinge While still holding in position fit one rivet to bottom hinge Step 3 Close door and check it fits correctly If not drill out rivets and make necessary adjustm...

Page 9: ...RITY DOOR Optional Step 1 Place shed in final position Check diagonal meas urements are equal and shed is level before fitting door Step 2 Hold Door in position approximately 5mm down from Top Plate F...

Page 10: ...all Sheets will then protrude 20mm below the Base Plate This will stop water flowing in between the Base Plate and Floor If you choose this option the Floor should be made 15mm smaller than Base Size...

Page 11: ...in most environments The surface must be dry and free of dirt oil grease and other contaminants prior to painting but no weathering of the surface is required Zinc rich primers are recommended for us...

Page 12: ...nd very severe environmental situations or in any area where the mild steel corrosion rate as published by BRANZ exceeds 200g m2 3 Minimum maintenance must be carried out in accordance with instructio...

Reviews: