background image

QTY

LENGTH

CHECKED   OUT

CHECKED        

IN

4

1.890

4

1.890

2

1.890

1

1.890

1

1.890

1

1.890

2

1.890

2

1.890

1

2

1.690

Ends         

2

1.690

Ends

5

1.810

Studs

2

1.833

Studs

2

1.600

45 x 45 H1

1

0.941

45 x 45 H1

1

0.818

45 x 45 H1

2

1.338

45 x 45 H1

1

SECURITY

2

Latches

1

1

1

COLOUR:__________________ INV# ______________             

Back Wall Nog

FLASHINGS

Door Jambs

Front Right Nog

Front Left Nog

End Wall Nogs

   PACKED BY:

DATE:            /             /        

Touch-up Paint & Brush

Hardware Pack

Clear Panel Hardware Pack

Assembly Instructions

2

1.890

TOP PLATES

TIMBER

Wall Sheets
Roof Sheets   

Or

BASE PLATES

ROOF SIZE: 2.840 x 1.890

Door

DESCRIPTION

Roof Sheet 

and

Clear Roof Panel

Folded Roof Sheets

Corner Wall Sheets

BASE SIZE: 2.810 x 1.690

TUF 800 PARTS LIST

1/2 Wall Sheets

3/4 Front Wall Sheet (D008)

- Blue     45 x 45 H1

- Green       45 x 45 H4

- Red   45 x 45 H1

- Yellow  45 x 45 H1

Summary of Contents for TUF 800

Page 1: ...Quality Made Affordable ASSEMBLY INSTRUCTIONS TUF 800 BASE SIZE 2810mm x 1690mm...

Page 2: ...checklist If you are making your own floor refer to Raised Base Plate section now Do not attempt to build your shed in high winds Beware of sharp edges Protect your eyes and ears Use electric tools w...

Page 3: ...Back Wall Nog FLASHINGS Door Jambs Front Right Nog Front Left Nog End Wall Nogs PACKED BY DATE Touch up Paint Brush Hardware Pack Clear Panel Hardware Pack Assembly Instructions 2 1 890 TOP PLATES TIM...

Page 4: ...3 Select remaining Base Plate Green and Top Front Plate 70 x 45mm Red Nail to End frames using two 75mm nails per join See fig 2 for nailing detail on Top Front Plate 70x45mm Red Use the back wall Nog...

Page 5: ...oor Jambs Position left hand Door Jamb Flashing at correct measurement from left cladding detail and nail to Top Plate using a 30mm clout Do not fit 50mm nails at this stage Pre drill holes to make na...

Page 6: ...doorway Rivet to Corner Wall Sheet one rivet top and bottom Posi tion and rivet in place all remaining Wall Sheets ensuring they overlap correctly While holding Front Wall Sheets up against Top Plate...

Page 7: ...to Top Plate using one 40mm Weatherseal nail beside each rib Repeat at the back Step 3a Roof with Clear Panel Refer next page Step 1 Note Condensation can form on the under side of shed roof If build...

Page 8: ...op End Plates and nail in place using a 30mm clout each end fig 3 Position Roof Sheets as shown in fig 1 When fitting Clear Panel ensure it OVERLAPS Roof Sheets Rivet sheet joins one rivet 200mm from...

Page 9: ...late Flashing and fit one rivet to top hinge While still holding in position fit one rivet to bottom hinge Step 3 Close door and check it fits correctly If not drill out rivets and make necessary adju...

Page 10: ...URITY DOOR Optional Step 1 Place shed in final position Check diagonal meas urements are equal and shed is level before fitting door Step 2 Hold Door in position approximately 5mm down from Top Plate...

Page 11: ...ll Sheets will then protrude 20mm below the Base Plate This will stop water flowing in between the Base Plate and Floor If you choose this option the Floor should be made 15mm smaller than Base Size N...

Page 12: ...in most environments The surface must be dry and free of dirt oil grease and other contaminants prior to painting but no weathering of the surface is required Zinc rich primers are recommended for us...

Page 13: ...nd very severe environmental situations or in any area where the mild steel corrosion rate as published by BRANZ exceeds 200g m2 3 Minimum maintenance must be carried out in accordance with instructio...

Reviews: