BEFORE YOU START:

 

 

• 

Read all instructions carefully

 

• 

Identify all parts and check quantities against parts list

 

• 

Select a level site

 

• 

Do not mark cladding with pencil as lead can cause corrosion to cladding

 

• 

During assembly, ensure all drill filings are removed between  layers of steel, before riveting together

 

 

 

SAFETY:

 

 

• 

Do not attempt to build your shed in high winds

 

• 

Beware of sharp edges, we recommend that you use gloves

 

• 

Protect your eyes and ears

 

• 

For ease of assembly, use a friend to help 

 

 

 

TOOLS REQUIRED:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WARRANTY REQUIREMENTS

:

 

 

The following maintenance process needs to be adhered to, to qualify for the steel warranty of your Duratuf Guardian 

shed.

 

 

 

• 

Wash all surfaces annually using a hose and soft nylon brush.

 

• 

Within 2 km of coast –

 

wash every 3 months as above. After a storm, wash the cladding and the gutters as soon 

as possible to remove any highly corrosive salt deposits.

 

• 

Volcanic Ash Fallout –

 

wash as soon as possible, removing fall out from roof and gutters.

 

• 

Do not allow manures, chemicals or other corrosive materials to have direct contact with cladding

.

 

CONGRATULATIONS ON PURCHASING A DURATUF GUARDIAN SHED. 

 

BEFORE YOU BEGIN THE ASSEMBLY PLEASE NOTE SOME IMPORTANT POINTS:

 

2

 

DRILL

 

RIVETER

 

3.5mm & 10mm 

DRILL BIT

 

HAMMER

 

LADDER

 

TAPE MEASURE

 

HEX DRIVE

 

NAIL PUNCH

 

SQUARE DRILL BIT

 

SKILL SAW 

 

(timber floor only)

 

Summary of Contents for Guardian Sheds GS73

Page 1: ...ASSEMBLY INSTRUCTIONS GS73 BASE SIZE 2 190m x 1 020m...

Page 2: ......

Page 3: ...ocess needs to be adhered to to qualify for the steel warranty of your Duratuf Guardian shed Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as ab...

Page 4: ...90m 1 Front Wall 1 890m 2 Back Wall 1 950m 4 Back Wall 1 Pan 1 950m 1 Side Wall Angle 1 905m 2 Side Wall Angle 1 935m 2 Roof 1 110m 4 Roof 1 Pan 1 110m 1 Door Sheet Narrow 1 850m 2 Door Sides 1 850m 2...

Page 5: ...RIPTION QTY DIAGRAM CHECKED Front Back Bottom Plates H4 Green 2 190 m 2 Front Back Top Plate H1 Red 2 190 m 2 Side Wall Bottom Plates H4 Green 1 020 m 2 Side Wall Top Plates H1 Red 1 022m 2 Spouting 2...

Page 6: ...ASSEMBLE BACK PANEL Top Plate Back Side Wall Sheets Barge Flashing Spouting Roof Sheets 4 Sheets 1Pan Sheet Top Plate Side Top Plate Front Bottom Plate Front Bottom Plate Side Back Wall Sheets 4 Shee...

Page 7: ...hrough from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bottom plat...

Page 8: ...door as shown ensuring narrow face of flashing is on the front as per fig 1 STEP 4 On the back of the door place door braces in posi tion as shown in fig 4 Ensure that the top and bottom ends of the b...

Page 9: ...Rivet sheets together on overlaps as shown STEP 3 Nail wall sheets to the Top Plate at each end making sure that the top of the sheets are flush with the top of the Top Plate and the sides of the wal...

Page 10: ...er on overlaps as shown BOTTOM PLATE TOP PLATE TOP PLATE 15mm 15mm BOTTOM PLATE 15mm 15mm 1918mm 1918mm TOP PLATE STEP 3 Nail the wall sheets to the Top Plate at each end making sure that the top of t...

Page 11: ...MBER BASE PLATE READ THE FOLLOWING For sheds with Raised Base Plate option only see page 6 deduct 30mm from measurement shown between Top and Bottom Plates on all wall panels so cladding protrudes 20m...

Page 12: ...h the second Side Panel ensuring that the Side Panel overlaps the Back Wall Panel STEP 3 Stand up the Front Wall Panel Ensure that the Front Wall Sheets overlap the Side Wall Sheets Using 8 x 40mm scr...

Page 13: ...ing up with the outside edge of the back wall cladding as in fig 4 Using 4 x 50mm Clouts predrill and nail the Roof Sheets to the Top Plates through the ribs at each corner ensuring ribs on the Roof S...

Page 14: ...onry drill bit is required FITTING A GUARDIAN FLOOR KIT OPTIONAL Position the Floor Joists centrally between the side Base Plates and skew nail each end with two 75mm nails Check that the shed is sitt...

Page 15: ......

Page 16: ...less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Faste...

Reviews: