![DURAG D-R 290 Operating Manual Download Page 100](http://html.mh-extra.com/html/durag/d-r-290/d-r-290_operating-manual_2541137100.webp)
5 | Installation
100
D-R 290
Fig. 5.34: Connecting the cable
1.
For connection of the individual cores, the retaining springs in the terminal strip are
pushed back using a screwdriver. This is done by inserting the screwdriver into the
) and bending the spring back.
2.
The cores should be stripped back and provided with end sleeves, then inserted
into the round opening (below) as far as the stop.
3.
Remove the screwdriver, and gently tug the core to check it is firmly seated.
For the customer's connections, the terminals X1, X2 and X3 (
are provided.
Fig. 5.35: D-TB 100 terminal box connection diagram
X1 is used to connect the D−TB 100 supply unit to the mains. Terminal X3 is used to
transmit the customer's analogue and status signals. X2 is for the customer's bus con
nection to the system.
Connections (by the
operating company)
Summary of Contents for D-R 290
Page 12: ...12 D R 290 ...
Page 18: ...1 General 18 D R 290 ...
Page 20: ...20 D R 290 ...
Page 28: ...2 Safety 28 D R 290 ...
Page 30: ...30 D R 290 ...
Page 38: ...3 Delivery 38 D R 290 ...
Page 40: ...40 D R 290 ...
Page 60: ...4 Product description 60 D R 290 ...
Page 106: ...106 D R 290 ...
Page 152: ...152 D R 290 ...
Page 174: ...8 Maintenance 174 D R 290 ...
Page 176: ...176 D R 290 ...
Page 178: ...9 Appendix 178 D R 290 Fig 9 2 Measurement point questionnaire 2 ...
Page 194: ...9 Appendix 194 D R 290 ...
Page 200: ...11 Index 200 D R 290 ...
Page 202: ...GmbH Kollaustraße 105 22453 Hamburg Germany www durag com ...