background image

Option 1 (soft ground)

Slide one ground anchor (part 12) into bottom of each 

post until it meets bottom cross rail.  Using two 1” self-

tapping screws per post, screw the post to ground 

anchor using the pilot holes for guides.

Using ground anchor installation layout drawing, dig 

holes approximately 10” deep.  Set trellis in holes and 

level.  Back fill with soil removed from holes.  

Option 2 (permanent installation)

NOTE: There is very little room for error with this 

installation method.  

Using ground anchor installation layout drawing, dig 

holes 10” deep according to dimensions.  Fill with 

cement and place ground anchors in wet cement.  Be 

sure that ground anchors are straight and in accordance 

with dimension of ground anchor installation layout 

drawing.  Allow cement to dry.  

Slide trellis over ground anchors.  Using two 1” self-

tapping screws, fasten post to ground anchor. 

Ground Anchor Installation

Ground Anchor Layout Drawing

27.75

"

Wellington Trellis - Page 4

Reviews: