
Installation / Assembly
dizzer L 55 vertical modules
– Assembly Instructions
Page 31 of 45
© inge GmbH
45-D02229-en, Rev. 2
5.4.3
Checking the Delivery for Completeness
Step
Activity
1
Check the completeness of the delivery against the packing list.
All packages on the packing list must be present.
2
Promptly inform your contact at inge GmbH if the number of pieces differs between the packing list
and the existing packages.
5.4.4
Unpacking the Parts
NOTE
CAUTION, PROPERTY DAMAGE!
Damages could be caused by abrupt temperature changes.
▪
Store the modules for at least two days at temperatures above
freezing before opening the packaging carton.
Remove the packaging and labeling.