27
Installation and Operation of 5/9 Electric Convection Oven
FLUE GUARD INSTALLATION
SECURING DOUBLE STACKED OVENS
1.) On rear of the top oven remove two existing screws
that are located at the lower right hand corner.
2.) On rear of bottom oven remove two existing screws
that are located at the upper right hand corner.
3.) Install stacking bracket using the existing screws
as shown in figure.
4.) Repeat steps to install 2nd stacking bracket on
left hand side.
SIDE MOUNTING SCREWS
P/N 600100
FLUE GUARD KIT
FLUE VENT
1.) Partially back-out the two side mounting screws of
the flue vent.
2.) Slide the keyhole slots of the flue guard over the
partially backed-out screws and then down.
3.) Tighten the two screws.
Summary of Contents for 59-E3V
Page 22: ...Installation and Operation of 5 9 Electric Convection Oven 22 5 9 DOOR ASSEMBLY TYPICAL...
Page 24: ...Installation and Operation of 5 9 Electric Convection Oven 24 5 9 XX CONTROLLER ASSEMBLY...
Page 28: ...Installation and Operation of 5 9 Electric Convection Oven 28 V CONTROLLER WIRING SCHEMATIC...