
- C 46 -
Short Seam Automat 2211-5 Working Instructions
Beisler Automated Sewing Equipment
C.5
Maintenance
C.5.3 Service
The following service works must be carried out in weekly
intervals.
Oiling the clamp rail:
1. Disconnect machine from power supply.
2. Wipe clamp rails clean using a soft, oil-saturated cloth.
The scope of delivery comprises 0.25 l of oil. When this
oil is used up, you can order the special machine oil
for service from the manufacturer or supplier of the ma-
chine.
Emptying the water separator:
1. Disconnect machine from power supply.
2.
Fig. 5:
Drain water at pressure reducer water separator
into suited container. Press button
1
at pressure re-
ducer collector and keep de pressed until water has
been drained completely.
NOTE - Sewing head!
For information about service of the sewing head,
please refer to the working instructions of the sewing
head.
Fig. 5
Fig. 5