MAINTENANCE PROCEDURES

A.  REPLACING HEATER TUBES

 

1) 

DISCONNECT UNIT FROM POWER SOURCE.

 

2)  Remove the enclosure.

 

3)  Remove heater tube wire from terminal block connection, keeping top and  

 

  bottom wires separate.

 

4)  Lift heater tube retainers by loosening retaining screws and sliding the retainer plate up.   

 

  Hand tighten the plate to hold it up so the heater tubes will slide out freely.

 

5)  Gently, pull defective heater tube out of unit.

 

6)  Gently, put new heater tube into unit.

 

7)  Loosen retainer screws and slide the retainer back into place. Tighten the screw to  

 

  secure the retainer in place over the ends of the heater tubes.

B.  REPLACING FAN MOTOR 

 

1) 

DISCONNECT UNIT FROM POWER SOURCE

.

 

2)  Remove screws from the enclosure and the back panel at rear of unit.

 

3)  Remove the enclosure and the back panel.

 

4)  Unplug power supply cord from fan motor.

 

5)  Remove (4) screws, which hold fan motor and grill to bottom of unit and remove fan.

 

6)  Put replacement motor and grill in place and secure to the bottom of unit with screws.

 

7)  Reconnect power supply cord to fan motor.

 

8)  Replace back panel and enclosure. Fasten with screws removed in step 2.

C.  REPLACING BELT DRIVE MOTOR 

 

1) 

DISCONNECT UNIT FROM POWER SOURCE.

 

2)  Remove enclosure and back panel.

 

3)  Remove sprocket from motor shaft, using an Allen wrench and loosening the set-screw.

 

4)  Remove the wire from terminal block connecting the drive motor to internal wiring.  

 

  On units rated 208 or 240 volts, note which color leads are being used for these connections  

 

  and which lead is capped with white tape. The new motor should use the same arrangement. 

 

5)  Remove screws holding motor in place and remove motor from unit.

 

6)  Put new motor in place and attach loosely with mounting screws.

 

7)  Replace sprocket on motor shaft.

NOTE:  The two sprockets should line up parallel with each other, so the chain does not twist 
any during operation.  Also the hub gets installed closets to the motor.

 

8)  Slide motor until the drive chain has about 1/4” slack when lightly pushed at the center of its top  

 

  open run.  

See chain tensioning illustration

.

 

9)  Tighten screws to secure motor.

 

10) Rewire leads same as removed in step 4.

 

11) Replace side panel and control box cover.

D.  CLEANING AIR INTAKE 

ONCE A WEEK.

 

1) 

DISCONNECT UNIT FROM POWER SOURCE.

 

2)  Place unit on its backside.

 

3)  Use a vacuum cleaner and or a  damp cloth to clean 

 

  the air intake.  This procedure should be done at least

E.  LUBRICATE THE CHAIN & SPROCKETS 

6 MONTHS

 

1) 

DISCONNECT UNIT FROM POWER SOURCE.

 

2)  Remove enclosure exposing chain drive.

 

3)   Using an extreme pressure, synthetic chain lubricant with a 

 

  temperature range up to 204°C.  Apply liberally onto chain  

 

  and sprockets.  This grease is available as part no. 1P-Z8914.

 

4)  Replace enclosure, Reconnect power source and test unit.

1/4”

QCS/RCS Chain Tension

Summary of Contents for QCS-2-800

Page 1: ...CONVEYOR TOASTER MODEL QCS 2 800 QCS 3 1000 Installation and Operation Instructions 2M HG0657 Rev D 6 13 05...

Page 2: ...out notice Such revisions do not entitle the buyer to corresponding changes improvements additions or replacements for previously purchased equipment MAINTENANCE AND REPAIRS Contact your local authori...

Page 3: ...8 lbs Dimensions 47 0 cm Width 56 8 cm Depth 39 7 cm Height 18 1 2 Width 22 3 8 Depth 15 5 8 Height CONTENTS Safety Symbols 2 Maintenance Repairs 2 Dualit Contact Information 2 Model Specifications 3...

Page 4: ...aim immediately with the carrier that handled the shipment Do not operate the unit if it was damaged during shipping ASSEMBLY AND INSTALLATION The QCS 2 800 unit was shipped fully assembled and ready...

Page 5: ...connect equipment to power without proper earth connections Improper grounding earth may result in personal injury or fatality WARNING DO NOT CUT OR REMOVE THIS PLUG OR GROUNDING EARTH PRONG FROM THE...

Page 6: ...set them both at HIGH 4 Allow warm up time of 5 to 10 minutes 5 Place a sample product on the conveyor belt to test the settings If toasting is too light turn conveyor speed control counterclockwise t...

Page 7: ...to carbonize CLEANING Preventive maintenance for your Dualit toaster consists of the following recommended cleaning procedures To keep your toaster in its top operating condition these steps should be...

Page 8: ...and loosening the set screw 4 Remove the wire from terminal block connecting the drive motor to internal wiring On units rated 208 or 240 volts note which color leads are being used for these connect...

Page 9: ...52 500 as the drive motor and or speed control may need replacing 8 Replace the enclosure by sliding it forward towards the front of the unit The front edge of the enclosure will slide beneath the toa...

Page 10: ...LK BRW YEL BLK PNK BRW BLU RED BLU ORG ORG RED RED 27 27 MODEL Dualit QCS 2 800 4 Tube SERIES THIS DRAWING CONTAINS INFORMATION CONFIDENTIAL TO DUALIT LTD NO REPRODUCTION OR DISCLOSURE OF ITS CONTENTS...

Page 11: ...27 9 27 0 5 2 2 2 27 27 0 2 5 27 27 MODEL QCS 3 1000 4 TUBE PARALLEL THIS DRAWING CONTAINS INFORMATION CONFIDENTIAL TO DUALIT LTD NO REPRODUCTION OR DISCLOSURE OF ITS CONTENTS IS PERMITTED 065607 02...

Page 12: ...6 15 16 17 18 19 20 22 23 24 25 27 28 29 30 31 32 33 34 36 21 35 3 38 MODEL QCS CONVEYOR TOASTER THIS DRAWING CONTAINS INFORMATION CONFIDENTIAL TO DUALIT LTD NO REPRODUCTION OR DISCLOSURE OF ITS CONTE...

Page 13: ...16 2R 200709 4 LEG 1 CHROME PLASTIC 17 2P 200736 2 SPRING BUSHING FRONT 18 2P 200700 2 BUSHING FRONT 19 2A 202904 1 SHAFT IDLER 20 SP 160027 1 BELT CONVEYOR 10 X 35 1 2 22 HA 100560 1 TRAY PULL OUT 23...

Page 14: ...UP 26 2A 200284 1 E CLIP 27 2E 200551 1 SWITCH ROTARY POWER SAVER 28 2J 200538 2 SWITCH INFINITE 29 2P 402728 1 ANTI SPIN PLATE 30 HO 118050 1 SWITCH SPEED CONTROL 500 ohm 31 2E 200566 1 SWITCH HIGH L...

Reviews: