
10
7- INSTALLATION
For ceiling mounted installation, it is recommended the use of appropriate clamps to fix
the unit to the mounting surface.
The supporting structure from which the unit is hung should be capable of bearing the
weight of the unit, as should any clamps used to hung it.
For outdoor application where BRICK needs to be installed vertically keep the
unit display towards the floor.
A permanent installation kit IP68 (code 03.LA.214) is available on demand.
ATTENTION:
A safety cable (code 0521A010) must be securely fixed to the unit’s mounting bracket
and to the support structure of the projector as shown in the picture.
Fixing clamps and safety cable are available on demand.