Connect the fuel supply to the inlet of the fuel solenoid (see table
for recommended line size).  The pressure at the secondary
demand regulator must be four to six ounces psi (per square
inch) or 7 to 11 inches W.C. (Water column)  for vapor withdrawal
units.  On units equipped with liquid withdrawal fuel systems full
tank pressure is plumbed to the fuellock strainer mounted on the
generator rails.  The fuel converter mounted on the unit will
handle both vaporization of the fuel and pressure reduction.

INSTALLING THE FUEL LINE

** NOTICE **

The engine generator sets are properly adjusted before they
leave the factory for a specific fuel, either NG (natural gas), LP
(liquid  propane vapor) or LPG (liquid withdrawal propane).  This
fuel type is noted in your model number.  If it becomes necessary
to change the fuel type in the field see information on page 12.

Line Size (vapor system)

Unit location will determine the size of fuel line that is required to
supply the engine with a constant fuel pressure.  Refer to the
tables below for fuel line size, fuel consumption and recom-
mended tank size.  For distances of 25 feet and over, a two
regulator fuel system is recommended.  This is accomplished by
installing a primary regulator at the tank which will reduce the
tank pressure down to 10 to 15 lbs.  A secondary regulator is
installed to further reduce the fuel pressure to the required six (6)
oz operating pressure.  This secondary regulator must be at least
10 feet from the engine generator set.  Any closer installation will
require a larger line be installed to provide a fuel reservoir.   If this
is not done, the demand regulator on the unit and the pressure
regulator in the fuel line will interfere with each other.  When this
two (2) stage regulator system is used, a fuel line size of 3/4 to 1
inch is generally adequate for distances up to 300 feet from the
primary to the secondary regulator.  (Consult your local fuel
supplier for your exact requirements). The appropriate line size
from the table below is then installed from the secondary regula-
tor to the generator set.

    *************
*****  WARNING  ****
    *************

PERSONAL DANGER - Do not use galvanized pipe in fuel line
runs.  The galvanized coating can become eroded and flake off,
causing possible obstructions in the regulator or fuel valve.  The
results could range from inoperative engine start to hazardous
fuel leaks.

Size of pipe normally required for generators operating on
NATURAL/LP gas:

       up to 25 feet*              over 25 feet*

PSS30

   1" pipe                   not recommended

PSS40

   1" pipe             use a two regulator system

* Allow an additional 3 feet for each standard elbow.

 Do not use ‘street ells’ (restrictive).

****  CAUTION  ****

EQUIPMENT DAMAGE - Be careful when sealing gas line joints.
Excessive sealing compound can be drawn into the solenoid,
regulator or carburetor causing an engine malfunction.

FUEL PRESSURE (vapor system)

Correct fuel pressure cannot be stressed enough.  The most
common cause for inoperative systems is an inadequate or
incorrect fuel pressure.  Performance of the engine is in direct
relation to the correctness of the fuel system.  Shown below is a
block diagram of a typical L.P. or N.G. Installation.

 Supply

   Primary

 Secondary

Generator

  Tank

   Regulator

 Regulator

   Set

        1                  2

3

    4

TWO (2) REGULATOR FUEL SYSTEM

   Supply

       Primary

Generator

    Tank

Regulator

     Set

1

2

4

SINGLE REGULATOR FUEL SYSTEM

Reference numbers 1 through 3 in the block diagrams above are
fuel lines supplied by customer.

Reference number 4 is the engine generator set.

Below is a table of the fuel pressure readings at each reference in
the system.

Fuel Pressure Table

Single Regulator (L.P. Vapor only)

1

2

3

UNIT OFF

TANK PSI

7-11 in

7-11 in

4-6 oz

4-6 oz

STARTING

TANK PSI

7-11 in

7-11 in

4-6 oz

4-6 oz

NO LOAD

TANK PSI

7-11 in

7-11 in

4-6 oz

 4-6 oz

FULL LOAD

TANK PSI

7-11 in

7-11 in

4-6 oz

4-6 oz

Two (2) Regulator System (L.P. Vapor only)

1

2

3

4

UNIT OFF

TANK PSI

10-15 lbs

7-11 in

7-11 in

4-6 oz

4-6oz

STARTING

TANK PSI

10-15 lbs

7-11 in

7-11 in

4-6 oz

4-6 oz

NO LOAD

TANK PSI

10-15 lbs

7-11 in

7-11 in

4-6 oz

4-6 oz

FULL LOAD TANK PSI

10-15 lbs

7-11 in

7-11 in

4-6 oz

4-6 oz

Natural Gas

1

2

4

UNIT OFF

LINE PSI

7-11 in

7-11 in

4-6 oz

4-6 oz

STARTING

LINE PSI

7-11 in

7-11 in

4-6 oz

4-6 oz

NO LOAD

LINE PSI

7-11 in

 7-11 in

4-6 oz

4-6 oz

FULL LOAD

LINE PSI

7-11 in.

7-11 in

4-6 oz

4-6 oz

Summary of Contents for WINCO PSS30/A

Page 1: ...PACKAGE STANDBY SYSTEMS INSTALLATION AND OPERATIONS MANUAL PSS30 A 2009 to 2010 Four Door Version...

Page 2: ...ned SAVE THESE INSTRUCTIONS This manual contains important instructions that should be followed during installation and maintenance of the generator and batteries Read and understand all instructions...

Page 3: ...electrician or contractor The installation must comply with all national state and local codes g Always make sure unit is disabled before placing your hands anywhere near the fan belts alternator or...

Page 4: ...on L P N G fuel The engine operates at 1800 rpm and frequency regulation is maintained by the electronic governor within 5 cycles variation from no load to rated load The 30 000 watt 30kW generator i...

Page 5: ...temperature battery voltage speed engine load coolant level from ECU ECU specific parameters and run time statistics A Liquid Crystal Display The backlit 64 by 128 pixel LCD serves as the local infor...

Page 6: ...setting or resetting the system clock 1 Press K right key for initial set or K left to back up up down to choose menu item and time date element to be changed 2 Press L Edit to access change mode to e...

Page 7: ...uld the instructions or information provided be interpreted to conflict with any local state or national codes If in doubt always consult your local fire marshal or gas supplier WARNING FIRE HAZARD Al...

Page 8: ...led from the secondary regula tor to the generator set WARNING PERSONAL DANGER Do not use galvanized pipe in fuel line runs The galvanized coating can become eroded and flake off causing possible obst...

Page 9: ...performed or supervised only by personnel knowledgeable of batteries and the required precautions Keep unauthorized personnel away from batteries When installing or replacing batteries use the proper...

Page 10: ...Check the electrolyte fluid in the battery periodically to be sure it is above the plates Never allow the battery to remain in a discharged condition CONNECTING THE BATTERY CHARGER BLOCKHEATER A two...

Page 11: ...ovided for you to connect your ground wire from the transfer switch to The lugs on the 40 kW will handle wire sizes 6 AWG to 250 MCM and should be torqued to 250 in lbs The lugs on the 30 kW will acco...

Page 12: ...Once the relay is opened the unit will shut down and remain in the standby mode until the remote start relay is closed again F ESTOP ESTOP Remote Emergency Stop terminals These two terminals are shipp...

Page 13: ...ator the next step is to check the voltage at the generator terminals in the Automatic Transfer Switch The voltage between the G1 and the G3 terminals should be the same as it was on the generator fro...

Page 14: ...C generator output from generator 2 Defective transfer switch controller 3 Incorrect voltage or frequecy for the generator 4 Wiring error between generator and transfer switch 5 Defective mechinally s...

Page 15: ...60706 190 Page 13 9158 00 VOLTAGE REGULATOR WIRING THREE PHASE AND SINGLE PHASE...

Page 16: ...Page 14 9158 00 60706 190 THREE PHASE AC WIRING HIGH AND LOW WYE THREE PHASE LOW WYE 120 208 VOLTS THREE PHASE HIGH WYE 277 480 VOLTS...

Page 17: ...60706 190 Page 15 9158 00 THREE PHASE AC WIRING DELTA SINGLE PHASE AC WIRING SINGLE PHASE 120 240 VOLTS THREE PHASE DELTA 120 240 VOLTS...

Page 18: ...Page 16 9158 00 60706 190 DC SCHEMATIC...

Page 19: ...60706 190 Page 17 9158 00 PSS30LS OUTLINE DRAWING AND WIRING ENTRANCE DIMENSIONS ARE SUBJECT TO CHANGE ALWAYS OBTAIN A CERTIFIED DRAWING FOR CONSTRUCTION PURPOSES...

Page 20: ...e are limited to 12 months or 1000 hours which ever accurs first from date of purchase In no event is WINCO liable for incidental or consequential damages Note Some states do not allow limitation on t...

Reviews: