![dtec GJD 350 Installation & Setup Manual Download Page 5](http://html.mh-extra.com/html/dtec/gjd-350/gjd-350_installation-and-setup-manual_2535823005.webp)
TAMPER CONNECTION
Installation & Set Up Guide
Stage 2 –
Connecting the Unit
5
ALARM OUTPUT 1
TO GJD LIGHTING CONTROLLER
TO GJD LIGHTING CONTROLLER
MULTIPLEXER, PTZ DOME,
DVR, ETC.
MULTIPLEXER, PTZ DOME,
DVR, ETC.
NORMALLY CLOSED
TAMPER CIRCUIT FRONT + REAR
- A S +
12VDC SUPPLY
0V SUPPLY
ALARM OUTPUT 2
CCTV2
CCTV1
TAMPER CONNECTION
fig. 7
fig. 8
Stage 3 –
Beam Alignment
-
The GJD
is supplied with two Fresnel lenses to provide a beam
pattern best suited to the cameras field of view. The 50 metre X 10 metre lens is
fitted to the unit when manufactured. If required this can be changed to the 50
metre X 5 metre lens which is supplied with the unit.
-
Movement across the beams produces the best response and range, whilst
movement towards the detector will be less responsive. The unit detects the
changes in heat and movement in the beam pattern, therefore items such as trees,
shrubs, ponds, boiler flues and animals should be considered when positioning
the detector.
Summary of Contents for GJD 350
Page 6: ......
Page 11: ...11 Installation Set Up Guide INSTALLATION NOTES ...
Page 12: ...0 7 1 0 3 ...