13) CONTROLS AND LIFE OF A LOAD CELL
13.1 STARTING PERIOD:
During the first months from the cell construction, are discharged the superficial stresses due
to the machining and the stresses included in the cements; they
follow
possible
little
variations of zero and sensitivity.
For laboratory precise tests, it is advisable a control and a calibration after the first 6 months
of life of the cell and, further, every year period.
For industrial applications the changes are insignificant and the recalibration useless.
13.2 CREEP:
On a cell loaded for a long period can appear creep of the metal body, of the cements, of the
plastic backing of the gauges.
This creep is shown as a variation of the measure and, unloading the cell, as a non-return to
zero. The variations are acceptable in industrial applications.
13.3 LIFE OF A CELL FOR USE WITH RISKS OF DAMAGES:
(See Chapter 5). After a maximum period of 5 years the cell must be substituted in use with
risks of damages.
A finished cell cannot be submitted to a complete check-up by ultrasound and
magnetoscopic tests, to discover fatigue deteriorations, microfractures, etc., due to unknown
shocks and vibrations.
This rule is imposed by several safety recommendations