12
4. Installation
4.1 Receipt and checking the content
Upon receiving the pump, you must ensure that the packaging is intact or whether there are clear signs of damage due to
transport or storage conditions. If everything is intact, proceed with unpacking and checking the pump.
Otherwise, if damage to the packaging is found, the transport agent and the manufacturer must be notified immediately.
The material received must always be checked to ensure that it corresponds to what is indicated on the accompanying
document.
The packaging must be opened using every precaution in order to prevent damage to people and the contents of the
package itself.
4.2 Packaging
The pump is packaged in the following way:
Secured on a metallic pallet with lateral packaging and cover in wood.
The wood can be reused or recycled in compliance with the prevailing laws in the country of installation of the pump.
Other materials such as cardboard, plastic or the protective film must be disposed of in accordance with the relevant
prevailing local regulations.
Do not burn or dispose of the package contents into the environment.
4.3 Transport and handling
DANGER
The transportation, lifting and handling operations must be carried out by expert and qualified personnel.
The pump can be lifted and handled with forklifts or pallet jacks suitable for the weight of the same, indicated on the
technical data table and in any case on the identification label. Manual handling and transport is permitted only in
compliance with the relevant prevailing local regulations.
Lift the equipment bearing in mind the direction indicated on the box.
The components of the machine can withstand temperatures during storage from -40°C to + 65°C (-
40°F~149°F). However, in order to prevent damage, start-up must take place when the machine has
reached a temperature of -10°C (+14°F).
ATTENTION
For transport, we recommend preparing the pump as indicated in the following section and emptying the
reservoir of oil.